NOTICE TO MARINERS
Depth of waters section fairway from buoy “0” to buoy “16” on Dinh An-Song Hau fairway
No. 114/TBHH-TCTBĐATHHMN dated June 20,2018
TVH – 16 – 2018.
Waters: Trà Vinh province.
Fairway: Định An – Sông Hậu.
VMS-South would like to inform that:
Within surveyed fairway’s bottom, 100m in width, is limited by AtoN system, section from buoy “0” to buoy “16” on Dinh An-Song Hau, 17.7km in length, depth in meters to Chart Datum:
- Section from buoy “0” to buoy “4”, 3.1km in length, depth in meters to Chart Datum is over 3.0m.
- Section fairway from buoy “4” to upstream of buoy “6A” + 907m, 4.3km in length, 2.4m in depth that are close to starboard hand mark, depth in meters to Chart Datum is over 2.5m.
- Section from upstream of buoy “6A” + 907m to downstream of buoy “10” – 230m, 1.85 km in length, depth in meters to Chart Datum is over 2.0m.
- Section from downstream of buoy “10” – 230m to buoy “12”, 3.2 km in length, depth in meters to Chart Datum is over 2,4m.
- Section from buoy “12” to buoy “16”, 5.3km in length, depth in meters to Chart Datum is over 4.0m.
NAVIGATION GUIDANCE:
All vessels navigating on Dinh An-Song Hau fairway should follow AtoN system, absolutely comply with appointment of Maritime Administration of Can Tho for maritime safety.