Friday, 22/10/2021

Notice to Mariners
Find by condition
Find by date
Số/ Thời gian ban hành Notice to Mariners
218/TBHH-TCTBĐATHHMN 01-09-2021 About the construction area of ​​the dredging works to maintain the Rach Gia fairway View details
215/TBHH-TCTBĐATHHMN 31-08-2021 The parameters depth of The 4500T Mechanical Dock Leveler waters and the wharf 3 waters – New Ba Son Shipyard View details
214/TBHH-TCTBĐATHHMN 27-08-2021 Parameters depth of Tat canal completed the construction of dredging and maintenance of the navigation channel has been completed for large tonnage ships entering the Hau River. View details
213/TBHH-TCTBĐATHHMN 27-08-2021 About the construction site at Lot 05-1b off the coast of Vietnam View details
211/TBHH-TCTBĐATHHMN 26-08-2021 Parameters depth of waters in front of wharfs no. “3”, “4” of Duyen Hai Power Center View details
210/TBHH-TCTBĐATHHMN 24-08-2021 Parameters depth of Dinh An-Song Hau fairway from buoys no.”0” to “16” View details
209/TBHH-TCTBĐATHHMN 20-08-2021 Parameters depth of Nam Can- Bo De fairway from buoys no.”0” to “12” + 1500m View details
208/TBHH-TCTBĐATHHMN 19-08-2021 Depth of section of the common fairway (the part inside the dike) adjacent to the separate passage in and out of Duyen Hai Power Center Terminal View details
207/TBHH-TCTBĐATHHMN 19-08-2021 Depth of water area in front of wharf 1, wharf 2, turning basin, separate channel in and out of Duyen Hai Power Center Wharf. View details
204/TBHH-TCTBĐATHHMN 13-08-2021 Parameters depth of waters in front of Saigon International Container Terminal – SSA (SSIT). View details
203/TBHH-TCTBĐATHHMN 13-08-2021 New establishment of special buoys for collecting wind and tide data by floating buoys (FLIDAR), Thang Long Wind wind power project, off Ke Ga cape, Binh Thuan province View details
202/TBHH-TCTBĐATHHMN 12-08-2021 New establishment of special buoys for collecting wind and tide data by floating buoys (FLIDAR), Thang Long Wind wind power project, off Ke Ga cape, Binh Thuan province View details
201/TBHH-TCTBĐATHHMN 05-08-2021 The new establishment of buoy under Vam Cong bridge View details
200/TBHH-TCTBĐATHHMN 03-08-2021 Depth of of waters in front of Hyosung Vina Chemicals port of Hyosung Vina Chemicals Company View details
199/TBHH-TCTBĐATHHMN 29-07-2021 The new establishment of buoy “ĐH1”, “ĐH2”, “ĐH3” serving the construction of Dong Hai Wind Power Plant Project 1 View details
198/TBHH-TCTBĐATHHMN 21-07-2021 Depth of waters zones in front of Wharf No. 4 (wharf B4), Go Dau B port View details
197/TBHH-TCTBĐATHHMN 21-07-2021 The new establishment of buoy “NC1”, “NC2″ Signaling the construction area for dredging and maintaining Nam Can – Bo De fairway View details
196/TBHH-TCTBĐATHHMN 20-07-2021 Depth of waters at pilot pick-up and drop-off area at Dinh An – Can Tho View details
195/TBHH-TCTBĐATHHMN 20-07-2021 Parameters depth of Sai Gon-Vung Tau fairway’s sallow sections in 2021 View details
194/TBHH-TCTBĐATHHMN 18-07-2021 The restoration of buoys “6” of Soai Rap fairway View details