Wednesday, 11/12/2024

Notice to Mariners
Find by condition
Find by date
Số/ Thời gian ban hành Notice to Mariners
299/TBHH-TCTBĐATHHMN 26-11-2024 The dredging and maintenance construction site on Sai Gon – Vung Tau fairway in 2023 View details
298/TBHH-TCTBĐATHHMN 25-11-2024 The new establishment of AtoN specialized buoys named “SG1″, “SG2″ on the dredging and maintenance construction site of the fairway in 2023. View details
297/TBHH-TCTBĐATHHMN 25-11-2024 The new establishment of AtoN buoy named “B” controlling the dangers area of collapsed Hoi Bai automated tide gauge station View details
296/TBHH-TCTBĐATHHMN 25-11-2024 The parameters depth of the waters in front of wharf 20.000 DWT, Cylindrical Fenders and wharf BP3 of Sai Gon Shipbuilding and Marine Industry Company Limited View details
295/TBHH-TCTBĐATHHMN 22-11-2024 The parameters depth of Dinh An – Hau River, the section from AtoN buoy no. “21” to Goi Lon canal View details
294/TBHH-TCTBĐATHHMN 19-11-2024 The parameters depth of the waters in front of the Open Petroleum Bonded Warehouse 102 View details
293/TBHH-TCTBĐATHHMN 19-11-2024 The parameters depth of the waters in front of Cai Mep International Container wharf ( Tan Cang – Cai Mep Thi Vai wharf) View details
292/TBHH-TCTBĐATHHMN 19-11-2024 The parameters depth of the waters in front of Cai Con General Port View details
291/TBHH-TCTBĐATHHMN 19-11-2024 The parameters depth of the waters in front of wharfs 1.000 DWT, 02 and 03 of Hai Doan 129 wharf – Truong Sa Marine Products One Member Limited Liability Company View details
290/TBHH-TCTBĐATHHMN 18-11-2024 The parameters depth of the waters in front of K2 oil petroleum depot port of Petrolimex Ba Ria – Vung Tau Company Limited View details
289/TBHH-TCTBĐATHHMN 14-11-2024 The Rach Gia fairway dredging and maintenance construction Rạch Giá (The implemented construction in 2024) View details
288/TBHH-TCTBĐATHHMN 12-11-2024 The stopped operation of AtoN specialized buoy named “DH1” serving the dredging and maintenance construction of specialized wharf which belongs to Duyen Hai 2 Thermal Power Plant Project. View details
287/TBHH-TCTBĐATHHMN 11-11-2024 The new establishment of AtoN specialized buoys named “MS12-6”, “MS12-12” serving the construction of the sand mine belongs to Group 3, river sand exploration area in An Lac Tay commune, Ke Sach district, Soc Trang province (signed MS12). View details
286/TBHH-TCTBĐATHHMN 11-11-2024 The stopped operation of AtoN specialized buoy named “DH2” serving the dredging and maintenance of Duyen Hai Power Center Wharf construction phase 2 in 2024 which has been stopped operation since November 06th, 2024. View details
285/TBHH-TCTBĐATHHMN 08-11-2024 The parameters depth of the waters in front of the specilized wharf of Duyen Hai 2 Thermal Power Plant. View details
284/TBHH-TCTBĐATHHMN 08-11-2024 The new establishment of AtoN specialised buoys named “MS4-A”, “MS4-D” serving the construction of sand mine signed MS 04 exploration, belongs to Zone 5, An Thanh 1 Commune Planning Area, Cu Lao Dung District, Soc Trang Province View details
283/TBHH-TCTBĐATHHMN 07-11-2024 The recorvery operation of Ba Dong Lighthouse’s main light View details
282/TBHH-TCTBĐATHHMN 06-11-2024 The parameters depth of the waters in front of FICO cement wharf of The Branch of FICO Tay Ninh Cement Joint Stock Company – Hiep Phuoc Grinding Station. View details
281/TBHH-TCTBĐATHHMN 06-11-2024 (Vietnamese) Về thông số kỹ thuật phạm vi, độ sâu khu vực đoạn luồng chung (ranh giới P6, P7, P8, T11) và Cầu cảng số 4 ra vào Bến cảng Trung tâm Điện lực Duyên Hải View details
280/TBHH-TCTBĐATHHMN 05-11-2024 The stopped operation of AtoN specialized buoys named “SH1”, “SH2”, “SH3” marking the construction of dumping waste which belongs to the maintenance and dredging fairway for large load ships entry of Hau River in 2023 View details