Wednesday, 15/07/2020

Notice to Mariners
Find by condition
Find by date
Số/ Thời gian ban hành Notice to Mariners
81/TBHH-TCBĐATHHMN 05-05-2020 Parameters of waters in front of Construction works area of Southern Vietnam Petrochemical Complex Project View details
79/TBHH-TCBĐATHHMN 28-04-2020 The construction and maintenance work of dredging the water area in front of wharf of K2-Vung Tau petroleum depot View details
78/TBHH-TCBĐATHHMN 27-04-2020 Depth of waters in temporary transshipment area at Duyen Hai – Tra Vinh of Quang Minh Logistics Development Joint Stock Company View details
77/TBHH-TCBĐATHHMN 27-04-2020 The barge QN – 7067 was sunk in the area of ​​Con Ngua in Ganh Rai Bay View details
75/TBHH-TCBĐATHHMN 23-04-2020 The new establishment of buoy “G1”, “G2” serving the construction contest of Rach Gia Passenger Port, Vinh Thanh Ward, Rach Gia City View details
71/TBHH-TCTBĐATHHMN 20-04-2020 Depth of shallow in Vung Tau-Thi Vai View details
70/TBHH-TCBĐATHHMN 20-04-2020 Carrying out the drilling rig KS Java Star 2 from anchor area H19-Vung Tau to Lot 0102 to repair RBB-5P well View details
69/TBHH-TCTBĐATHHMN 16-04-2020 Depth of waters in front of Thiềng Liềng 6/8 mooring buoy of Saigon Port View details
68/TBHH-TCTBĐATHHMN 16-04-2020 Construction and dredging of survey and dredging works for periodic inspection of wharves, segments 9 – 17 of the wharf, based on petroleum technical services View details
67/TBHH-TCBĐATHHMN 16-04-2020 Depth of waters in front of waters in front of barges 2000 – 5000DWT International Port Co. Ltd. Thi Vai View details
66/TBHH-TCBĐATHHMN 14-04-2020 Depth of waters in front of Port Cái Mép International Terminal View details
65/TBHH-TCBĐATHHMN 12-04-2020 New establishment of AtoN buoy no. “13” of Sài Gòn – Vũng Tàu fairway View details
64/TBHH-TCTBĐATHHMN 11-04-2020 Pausing maritime operation ofbeacon no. “13” SàiGòn – VũngTàu fairway View details
63/TBHH-TCBĐATHHMN 10-04-2020 Parameters of Dinh An – Song Hau fairway in Mekong Petroleum area View details
62/TBHH-TCTBĐATHHMN 09-04-2020 Parameters of fairway for large load vessel in and out of Hau River View details
61/TBHH-TCTBĐATHHMN 07-04-2020 The change in characteristics of specialized buoy “S1”, “S2” marking construction area for disposal of VIETSUN INTEGRITY wreck on Saigon – Vung Tau fairway View details
60/TBHH-TCTBĐATHHMN 07-04-2020 The restoration of buoy “26A” Sai Gon – Vung Tau fairway View details
59/TBHH-TCBĐATHHMN 07-04-2020 Termination of buoys “26C”, “31A” and “31B” in service of the traffic flow through the area of ​​VIETSUN INTEGRITY ship which is sunk on Saigon – Vung Tau fairway View details
58/TBHH-TCTBĐATHHMN 07-04-2020 The change in characteristics of buoys”28″ on Saigon-Vung Tau fairway View details
57/TBHH-TCTBĐATHHMN 07-04-2020 The opening of CV001 underground valve on gas pipeline 16A Bach Ho – Dinh Co, CCP area of ​​CCP Bach Ho View details