Saturday, 19/04/2025

Notice to Mariners
Find by condition
Find by date
Số/ Thời gian ban hành Notice to Mariners
264/TBHH-TCTBĐATHHMN 21-11-2022 The construction area dredged the water area in front of the wharf No. 01 of the Cai MepThuong container port View details
263/TBHH-TCTBĐATHHMN 18-11-2022 Depth of waters on shallows Ganh Rai bay, Kervella, Mui L’est, Propontis, buoy No. “58”, P71 – ĐT83, turning basin VQ2 belong to Sai Gon – Vung Tau, Soai Rap fairway dredging works (section Hiep Phuoc) in 2021 View details
262/TBHH-TCTBĐATHHMN 16-11-2022 Depth of waters on Dinh An – Hau river fairway, section from buoy No. “21” + 800 m to Goi Lon channel View details
261/TBHH-TCTBĐATHHMN 16-11-2022 New establishment of AtoN systems entry to the harbor of International Marina, Khanh Hoa province View details
260/TBHH-TCTBĐATHHMN 16-11-2022 Depth of waters in front of Saigon International Terminals Vietnam Limited (SITV) View details
259/TBHH-TCTBĐATHHMN 15-11-2022 New establishment of specilized buoys “BT1”, “BT2” Serving domestic wharf construction of Tran De Industrial Park View details
258/TBHH-TCTBĐATHHMN 15-11-2022 Depth of waters in front of pier V1, V2, V3&V4 – VICT port View details
257/TBHH-TCTBĐATHHMN 10-11-2022 Depth of waters in front of Hyosung Vina Chemicals port of Hyosung Vina Chemicals Co., Ltd View details
256/TBHH-TCTBĐATHHMN 09-11-2022 Change of Ba Ke light-house characteristics View details
255/TBHH-TCTBĐATHHMN 09-11-2022 Depth of waters in front of PTSC Phu My Port Joint Stock Company View details
254/TBHH-TCTBĐATHHMN 08-11-2022 New establishment of specialized buoys “P1”, “P2” that is limitted the construction and repair area, restoring the anchor of Phuoc Khanh Petroleum port View details
253/TBHH-TCTBĐATHHMN 08-11-2022 Depth of waters Specifications of anchoring area waiting for the bridge, waiting for a combination of storm shelters for boats in Xuan Dai Bay in the seaport country managed by Maritime Administration View details
252/TBHH-TCTBĐATHHMN 07-11-2022 New establishment of the downstream, upstream regulation stations (Dong Nai 1, 2 stations) serving the construction of Nhon Trach Bridge crossing the Dong Nai River View details
251/TBHH-TCTBĐATHHMN 07-11-2022 The construction area of ​​water dredging works in front of Cai Mep Gemadept port – Terminal Link View details
250/TBHH-TCTBĐATHHMN 04-11-2022 Parameters depth of Soai Rap fairway View details
249/TBHH-TCTBĐATHHMN 04-11-2022 Dredging and maintenance of waters in front of Cai Mep International Port View details
248/TBHH-TCTBĐATHHMN 04-11-2022 Parameters depth of Saigon Petro Petroleum Port waters View details
247/TBHH-TCTBĐATHHMN 04-11-2022 Depth of waters in front of Sa Dec newport View details
246/TBHH-TCTBĐATHHMN 03-11-2022 The construction area of ​​Nhon Trach Bridge crosses the Dong Nai River, the component project 1A of the investment project of Tan Van – Nhon Trach stage 1 phase 1 of Ho Chi Minh City Ring Road 3 View details
245/TBHH-TCTBĐATHHMN 03-11-2022 Change the characteristics of the buoy No. “10A”, “21” on Dong Nai fairway serving the construction process of Nhon Trach Bridge crossing the Dong Nai River View details