Wednesday, 23/04/2025
Sorry, this entry is only available in Vietnamese.
Depth of turning basin and Soai Rap fairway from upper stream of SPCT Port to upper stream of Tan Cang Hiep Phuoc Port
(Vietnamese) Độ sâu vùng nước 02 Ụ tàu của Trạm nghiền Phú Hữu
The new establishment of the AtoN specialised buoy named “NĐ1” serving the instalation construction area of ĐN3200 blind pipeline of the cooling system which belongs to the project of PVPOWER NHONTRACH 3&4 on Long Tau River
Recovery of stand by latern operation of Da Trang lighthouse
116/TBHH-TCTBĐATHHMN – Depth of SoaiRap-HiepPhuoc fairway