Monday, 30/03/2020

Notice to Mariners

Depth of area in front of SPCT Port

NOTICE TO MARINERS

Depth of area in front of SPCT Port

No. 246/TBHH-TCTBĐATHHMN dated December 25, 2015

HCM – 55- 2015

Waters:            Ho Chi Minh

Fairway:          Soai Rap.

Southern Vietnam Maritime Safety Corporation would like to inform:

  1. Within the surveyed area in front of SPCT Port indicated by the following coordinates:
Point VN-2000 WGS-84
Latitude (j) Longitude (l) Latitude (j) Longitude (l)
NV1 10038’25,1” N 106045’39,5” E 10038’21,4” N 106045’45,9” E
NV2 10038’31,7” N 106045’24,4” E 10038’28,1” N 106045’30,9” E
NV3 10038’34,2” N 106045’24,2” E 10038’30,5” N 106045’30,6” E
NV4 10038’26,5” N 106045’41,5” E 10038’22,9” N 106045’47,9” E

- The smallest depth to Chart Datum is 10,0m.

  1. Within the surveyed waters towards to fairway indicated by points with the following coordinates:
Points VN-2000 Hệ WGS-84
Latitude (j) Longitude (l) Latitude (j) Longitude (l)
NV3 10038’34,2” N 106045’24,2” E 10038’30,5” N 106045’30,6” E
NV4 10038’26,5” N 106045’41,5” E 10038’22,9” N 106045’47,9” E
A1 10038’28,1” N 106045’43,7” E 10038’24,4” N 106045’50,1” E
NV7 10038’35,2” N 106045’24,1” E 10038’31,5” N 106045’30,5” E

- The smallest depth to Chart Datum is 9,5m.


Other notice

New establishment of 04 AtoN buoys “P1”, “P2”, “P3”, “P4” indicating the construction of shore protection embankment on Mui Den Do park Sai Gon – Vung Tau fairway

Parameters depth of Dinh An-Song Hau fairway, section fairway from AtoN buoy no. “0” to AtoN buoy no.”16″

Depth of waters in front of wharf No.1 for vessels 30.000DWT – Long An port

28/TBHH-TCTBĐATHHMN – Establish aid to navigation buoys on activities construction on Vungtau – Thivai channel

Regarding Niccolo Machiavelli vessel dredging fairway into wharves, water area in front of wharves, turning basin of Hydrocarbon wharves 1 and 2 of Package F of Southern Petrochemical Complex Project