Depth of waters in front of 50000 DWT barge wharf – Thi Vai-Holcim Viet Nam Clinker Grinding Station

NOTICE TO MARINERS

Ref: Depth of waters in front of 50000 DWT barge wharf – Thi Vai-Holcim Viet Nam Clinker Grinding Station

No. 164/TBHH-TCTBĐATHHMN dated September 14th, 2015

VTU – 64 – 2015

  • Waters area: Ba Ria – Vung Tau Province
  • Fairway: Vung Tau – Thi Vai

VMS-South would to like to inform:

  1. In surveyed waters in front of 50000DWT barge wharf – Thi Vai-Holcim Viet Nam Clinker Grinding Station limited by the following co-ordinates:
Point VN-2000 WGS-84
Latitude (j ) Longitude (l ) Latitude (j ) Longitude (l )
N1 10036’19,9” N 107001’04,8” E 10036’16,3” N 107001’11,3” E
N2 10036’12,0” N 107001’08,4” E 10036’08,3” N 107001’14,8” E
N3 10036’13,2” N 107001’11,1” E 10036’09,5” N 107001’17,5” E
N4 10036’21,1” N 107001’07,5” E 10036’17,4” N 107001’14,0” E

– The depth in meter to Chart Datum is 12.1m or over.


Other notice

Deploying to connect, trying to test pipes “26”, “16”, the supplementary upgrading infrastructure project of Bach Ho area belongs to Nam Con Son 2 gas pipeline phase 1 Project and Dai Hung Gas Gathering Project

(Vietnamese) Về việc kéo giàn khoan Parameswara từ cảng Balikpapan – Indonesia đến cảng Cái Mép – Vũng Tàu và từ cảng Cái Mép – Vũng Tàu đến lô 01&02/10 để khoan giếng KNV-4XP, ngoài khơi biển Việt Nam

Depth of waters connecting to wharf No. 5 that for vessels load to 70.000 DWT – Long An international port

Termination of waterborne traffic regulation indicating the construction of water pipe from BOO water Joint Stock Company to Phu Dong Ward, Tien Giang Province

Depth of pilotage area for pilots in Vung Ro fairway