Tuesday, 18/03/2025

Notice to Mariners

34/TBHH-TCTBĐATHHMN – Depth of Dinh River fairway

NOTICE TO MARINERS

 Depth of Dinh River fairway

VTU -16 – 2012

– Sea area:   Baria – Vungtau Province

– Fairway’s name: Dinh River fairway.

On behalf of Ministry of Transport, Southern Vietnam Maritime Safety Corporation notifies that:

In the designed navigational faiway width of 80m, limited and guided by AtoNs system, depth in meter reduced to chart datum, details as follow:

1)    From buoy No. “9” of VungTau – ThiVai fairway to buoy No. “8” of Dinh river fairway, the least depth is 6.7m.

2)    From buoy No. “8” of Dinh river fairway to upstream Vinaoffshore Port +200m, the least depth is 5.6m.

3)    From upstream Vinaoffshore Port +200m to buoy No. “22”, the least depth is 4.1m.

NAVIGATING GUIDANCE:

Every vessels navigating on Dinh river faiway should follow AtoN system and apply reasonable measures to ensure traffic safety.

Other notice

Depth of Soai Rap fairway – section from the confluence of Binh Khanh, Nha Be River to turning basin of Hiep Phuoc Industrial Zone

Completing salvage of Pacific 05 vessel and sunken cargo in the waters of Mui Ne, Binh Thuan province

Maritime operation of M/V Nile River vessel to serve execution of Nam Con Son 2 gas pipeline Project

Depth of waters in Bến Đầm – Côn Đảo fairway

Depth of waters in morring buoy and turning basin Vung Ro petro port