Wednesday, 19/01/2022

Notice to Mariners

Depth after maintenance dredging of Song Dinh fairway in 2015 No.183/TBHH-TCTBĐATHHMN dated September 25, 2015

NOTICE TO MARINERS

Depth after maintenance dredging of Song Dinh fairway in 2015

No.183/TBHH-TCTBĐATHHMN dated September 25, 2015

VTU – 77 – 2015

Waters: Ba Ria-Vung Tau Province

Fairway: Song Dinh

Southern Vietnam Maritime Safety Corporation would like to inform:

Within the bottom fairway range is limited and guided by the Aton system, the smallest depth to chart datum are as follows:

  1. The section fairway from sea (continuously from the Vung Tau-Thi Vai fairway route) to Vietsovpetro wharf (T7), is 100m in width, the smallest depth is 7.0m
  2. The section fairway from Vietsovpetro wharf to the upstream of Vina Offshore wharf +200m, is 80m in width, the smallest depth is 5.8m
  3. The section fairway from the upstream of Vina Offshore +200m to Cay Khe confluence, is 80m in width, the smallest depth is 4.1m

NAVIGATION GUIDANCE:

All means navigating on Song Dinh fairway have to follow the Aton system for maritime safety./.


Other notice

Parameters depth of waters in front of wharfs no. “3”, “4” of Duyen Hai Power Center

Depth of waters in turning basin and buoy in PV Oil Vung Ro

Depth of waters in front of wharf No. 1 and 2 – Vedan Viet Nam Enterprise Corp.,LTD

Adjustment of Regulation Station No.1’s position to serve execution of Package F of Long Sơn Petrochemicals – LSP (Phase 2)