Southern Vietnam Maritime Safety Corporation would like to inform:

Within range of Dinh river limited and guided by Aton system, least depth in meters to Chart Datum as follows:

  1. Fairway section (from Vung Tau-Thi Vai fairway to Vietsovpetro (T7) wharf) is 100m in width, least depth is 7.0m
  2. Section from Vietsovpetro wharf to upstream of Vina Offshore wharf + 200m, is 80m in width, least depth is 5.8m

NAVIGATION GUIDANCE:

All means navigating in Dinh river have to follow AtoN system for maritime safety.


Other notice

The construction activities of pipe spraying for the road project Nam Con Son 2 gas pipeline adjusts

Depth of waters at mooring buoy BP4 30.000DWT on Nha Be river

Depth of waters in front of Thiềng Liềng 6/8 mooring buoy of Saigon Port

Change light characteristics of Da Trang lighthouse

Depth of waters in front of Phu My oil port of Phu My 2.1 1 thermal power plant