Wednesday, 19/03/2025
Sorry, this entry is only available in Vietnamese.
Depth of waters in front of Ninh Chu bridge – Ninh Thuan province
Depth of waters in front of Petroleum service port segment 1-7 of PTSC Supply Base
Depth of waters shiplift 4.500T, the wharf No. 3, wharf 150.000 DWT (wharf 2), wharf 70.000 DWT không tải (wharf 1), wharf barge berth, out of fairway to connect to barge berth, the Dock 8.500T; the Dock 8.850T, the Dock 8.850T, the Dock 8.850T out of fairway – Ba Son Corporation
(Vietnamese) Về thông số kỹ thuật độ sâu luồng hàng hải Đồng Tranh – Gò Gia
Regarding the Nile River vessel’s work in the construction of dredging for the adjusted Nam Con Son 2 gas pipeline project