Saturday, 22/03/2025

Notice to Mariners

Annual dredging work for Quy Nhon channel 2014

NOTICE TO MARINERS

Ref: Annual dredging work for Quy Nhon channel 2014

No. 169/TBHH-TCTBĐATHHMN dated on October 21st, 2014

BĐH – 02 – 2014

Water area: Binh Dinh province

Channel: Quy Nhon

VMS-South would to like to inform:

  1. Execution means are included: excavators, self-propelled bottom-opened barges, tug boats.
  2. Dumping area is limited by co-ordinates: Longitude 109018’00’’N, Latitude 13044’00’’E (WGS-84) and area to dump around 0.5 nautical miles from the center dumping area as per the letter 2187/UBND-KTN dated 30/5/2014 of the People’s Committee of Binh Dinh  province.
  3. Dredging area

- Section 1: from the beginning of channel to TC2

- Section 2: From TC2 to turning basin

4. Execution duration: 60 days since 21/10/2014

Navigation Guidance:

All vessels navigating through the above area on Quy Nhon channel should notice, watch carefully and contact executing units by VHF for maritime safety.


Other notice

Implemting the work of replacing the Umbilical valve SSIV TGT wire at the Riser Block CCP BH rig area

The position of regulating station No. 1 and 2 for the construction of Package F of the South Vietnam Petrochemical Complex Project

(Vietnamese) Về thông số kỹ thuật độ sâu của khu nước trước bến cảng Container Trung tâm Sài Gòn (SPCT)

The new establishment of specialized buoy “SĐ3”, “SĐ4”, “SĐ5”, “SĐ6” in service of construction of towing rope across the sub-branch of Hau river of 500kV Song Hau – Duc Hoa transmission line project

Removing buoys “Q1”, “Q2” on Soai Rap fairway