Monday, 10/02/2025
Sorry, this entry is only available in Vietnamese.
The new establishment of specialized buoys “N1″, “N2″, “N3″, “N4″ of 220kV renovating and upgrading works in Cao Lanh – Thot Not
Regarding the termination of the operation of specialized maritime signaling buoys for the construction of dredging works to maintain navigation channels for large tonnage ships entering the Hau River in 2020
The temporarily stopped operation of AtoN buoys no. “27”, “28” on Tien River fairway
Parameters depth of fairway in and out port, turning basin, and waters in front of Xuan Thanh Bagging factory, cement distribution station
(Vietnamese) Thông số kỹ thuật luồng hàng hải Sông Dinh