Establishing AtoN systems to serve the project: Upgrading 220 KV electric wire of Cai Lay – Tra Noc, section: Hau River

NOTICE TO MARINERS

Ref: Establishing AtoN systems to serve the project:

Upgrading 220 KV electric wire of Cai Lay – Tra Noc, section: Hau River 

No. 161/TBHH-TCTBĐATHHMN dated on October 02nd, 2014

TVH – 09 – 2014.

Water area:             Tra Vinh province

Channel:                 Dinh An – Can Tho

Buoy name:            “A1”, “A2”, “A3”, “A4”.

VMS-South would to like to inform the following co-ordinates:

Buoys

VN-2000

WGS-84

Latitude (φ)

Longitude (λ)

Latitude (φ)

Longitude (λ)

“A1”

10008’45”7N 105040’02”8E 10008’49”4N 105039’56”3E

“A2”

10008’34”1N 105039’54”8E 10008’37”8N 105039’48”4E

“A3”

10009’08”4N 105039’37”0E 10009’12”0N 105039’30”6E

“A4”

10008’52”5N 105039’27”6E 10008’56”1N 105039’21”1E

+ Effect:                  There are 04 AtoN buoys to serve the project: Upgrading 220 KV electric wire of Cai Lay – Tra Noc, section: Hau River

+ Shape:                 Net pyramid

+ Color:                  Yellow

+ Peak sign:            An “X” in yellow

+ Number sign:      “A1”, “A2”, “A3”, “A4” in red on yellow background.

+ Lighting characteristics: yellow light, group flash (3+1) with a circle 12 seconds, range 2.5 NM

Navigation Guidance:

All vessels navigating on Dinh An – Can Tho channel and through the above area should notice AtoN buoys with these above characteristics and go away for maritime safety.


Other notice

Depth of extending waters in southern, fairway in-out barge and waters in front of barge International container port SP – SSA (SSIT)

About the construction site at Lot 05-1b off the coast of Vietnam

Depth of waters in front of VK102 oil port / Military Zone 7

The new establishment of buoy “L3” marks obstruction on Ha Tien fairway belonging to the land reclamation project (leveling) L package belonging to the South Vietnam Petrochemical Complex Project

Depth of waters in front of Thi Vai General port