Wednesday, 19/03/2025

Notice to Mariners

New establishment of AtoN special buoy lettered “BĐ1” on fairway of large load vessels in and out of Hau River

NOTICE TO MARINERS

New establishment of AtoN special buoy lettered “BĐ1”  on fairway of large load vessels in and out of Hau River

 No. 271/TBHH-TCTBĐATHHMN dated November 27, 2020

TVH – TG – 22 – 2020

Waters: Tra Vinh Province

Fairway: large load vessels in and out of Hau River

Special buoy lettered: “BĐ1”

         Southern Vietnam Maritime Safety Corporatio would like to inform that: New establishment of AtoN special buoy lettered “BĐ1” on fairway of large load vessels in and out of Hau River with characteristics as follows:

- Position for establishment: Fairway of large load vessels in and out of Hau River

- Geographical coordinates:

Special buoy lettered VN-2000 WGS-84
Latitude (j) Longitude (l) Latitude (j) Longitude (l)
“BĐ1” 09°33’26,0”N 106°32’16,5”E 09°33’22,3”N 106°32’23,0”E
  • Function: to indicate top dike area on fairway of large load vessels in and out of Hau River.

CHARACTERISTICS:

  1. Day time:
  • Shape: Lattice tower;
  • Color: Yellow;
  • Topmark: Letter “X” in yellow;
  • Number sign: Letter “BĐ1”, in red;
  1. Night time:
  • Light characteristics: Yellow light, flash group (3+1), every 12,0s;
  • Luminous range: 2,5 NM.

NAVIGATION GUIDANCE:

All means navigating on on fairway of large load vessels in and out of Hau River, pay attention to special buoy with characteristics mentioned above, in accordance with guidance of AtoN buoys system and absolutely comply with Vietnam Maritime Administration of Can Tho for maritime safety.

 

SIGN ON BEHALF OF DIRECTOR GENERAL

DEPUTY DIRECTOR GENERAL

(Signed and Sealed)

Phạm Tuấn Anh


Other notice

The new establishment of buoy “NC1”, “NC2″ Signaling the construction area for dredging and maintaining Nam Can – Bo De fairway

(Vietnamese) Về việc thiết lập mới 01 phao báo hiệu chuyên dùng “K8” thi công nạo vét duy tu luồng hàng hải cho tàu biển trọng tải lớn vào sông Hậu năm 2017.

Depth of waters in front of PVGAS’s terminals

Termination of buoy “19” on Dong Nai fairway

The technical parameters depth of the waters in front of Saigon Petro Petroleum Terminal