Wednesday, 19/01/2022

Notice to Mariners

The new establishment of buoy “G1”, “G2” serve for constructing the Korean Wind Power Plant – Tra Vinh (phase 1)

NOTICE TO MARINERS

The new establishment of buoy “G1”, “G2” serve for constructing the Korean Wind Power Plant – Tra Vinh (phase 1)

 No.  32/TBHH-TCTBĐATHHMN dated March 16, 2020

TVH – TG – 04 – 2020

  • Waters: Trà Vinh province

- Buoys:      “G1”, “G2”.

VMS-South would like to inform that: The new establishment of specialized buoy “G1”, “G2” serve for constructing the Korean Wind Power Plant – Tra Vinh (phase 1):

- Position: Trường Long Hòa commune, Duyên Hải town, Trà Vinh province.

- Coordinates:

Bouy VN-2000 WGS-84
Latitude (j) Longitude (l) Latitude (j) Longitude (l)
“G1” 09°36’04,29”N 106°33’54,34”E 09°36’00,62”N 106°34’00,75”E
“G2” 09°34’42,88”N 106°33’48,87”E 09°34’39,21”N 106°33’55,28”E
  • Function: Marking the water area under construction

CHARACTERISTICS:

  1. Day time:
  • Diameter: 2,0m;
  • Shape: Tower;
  • Color: Yellow;
  • Top-mark:            letter “X” yellow;
  • Code: letter:“G1”,“G2”, red on a yellow background;
  1. Night time:
  • Light characteristics: Yellow light, group flashing (3+1), every 12,0s;
  • Luminous range: 2,5 NM.

NAVIGATION GUIDANCE:

  • All vessels navigating on Trà Vinh waters should follow Notice to Mariners, paper chart and AtoN system to have methods of safety navigation, and absolutely comply with the Administration of Cần Thơ for maritime safety./.
  • More information contact Tra Vinh Wind Power No.1 Joint Stock Company.

ON BEHALF OF DIRECTOR GENERAL

DEPUTY DIRECTOR GENERAL

Signed and Sealed

 

Pham Tuan Anh


Other notice

Depth of waters area in front of wharfs no 1 & 2 Vedan Vietnam Company

(Vietnamese) Về thông số kỹ thuật khu nước trước bến K17, K18 –Cảng Lotus.

11/TBHH-TCTBĐATHHMN – Termination of operation Beacon “13” Saigon – Vungtau channel

Shallow sections: Dan Xay, Đa Han, Navioil on Sai Gon – Vung Tau fairway in 2016

Execution area: Tran Hung Dao vessel is used to execute maintenance dredging on Dinh An-Can Tho fairway 2016