NOTICE TO MARINERS
The new establishment of buoy “G1”, “G2” serving the construction contest of Rach Gia Passenger Port, Vinh Thanh Ward, Rach Gia City
No. 75/TBHH-TCTBĐATHHMN dated April 23, 2020
KGG – TG – 04 – 2020
- Waters: Kiên giang province
- Fairway: Rạch Giá
- Buoys: “G1”, “G2”.
VMS-South would like to inform that: The new establishment of buoy “G1”, “G2” serving the construction contest of Rach Gia Passenger Port, Vinh Thanh Ward, Rach Gia City:
- Position: the construction contest of Rach Gia Passenger Port, Vinh Thanh Ward, Rach Gia City, Kien Giang province.
- Coordinates:
Buoy | VN-2000 | WGS-84 | ||
Latitude (j) | Longitude (l) | Latitude (j) | Longitude (l) | |
“G1” | 10°00’20,70”N | 105°04’02,70”E | 10°00’17,06”N | 105°04’09,13”E |
“G2” | 10°00’31,30”N | 105°04’19,21”E | 10°22’27,66”N | 105°04’25,64”E |
- Function: Marking limiting the water area under construction.
CHARACTERISTICS:
- Day time:
- Type of buoy: D = 2,0m
- Shape: Tower;
- Color: Yellow;
- Top-mark: letter “X” yellow;
- Code: “G1”, “G2”, red;
- Night time:
- Light characteristics: yellow light, group flashing (3+1), every 12,0s;
- Luminous range: 2, 5 NM.
NAVIGATION GUIDANCE:
- All vessels navigating in Rach Gia fairway, Kien Giang province based on the Notice to Mariners, paper charts, depth and AtoN system and should have methods of safety navigation. Absolutely comply with the regulation of Kien Giang Maritime Administration for maritime safety./.
- More information contact The Management Board signs the transport construction investment project of Kien Giang province.
SIGN ON BEHALF OF DIRECTOR GENERAL
DEPUTY DIRECTOR GENERAL Signed and Sealed
Pham Tuan Anh |