Tuesday, 29/04/2025

Notice to Mariners

The new establishment of buoy “G1”, “G2” serving the construction contest of Rach Gia Passenger Port, Vinh Thanh Ward, Rach Gia City

NOTICE TO MARINERS

The new establishment of buoy “G1”, “G2” serving the construction contest of Rach Gia Passenger Port, Vinh Thanh Ward, Rach Gia City

No. 75/TBHH-TCTBĐATHHMN dated April 23, 2020

KGG – TG – 04 – 2020

  • Waters: Kiên giang province
  • Fairway: Rạch Giá

- Buoys:      “G1”, “G2”.

VMS-South would like to inform that: The new establishment of buoy “G1”, “G2” serving the construction contest of Rach Gia Passenger Port, Vinh Thanh Ward, Rach Gia City:

- Position: the construction contest of Rach Gia Passenger Port, Vinh Thanh Ward, Rach Gia City, Kien Giang province.

- Coordinates:

Buoy VN-2000 WGS-84
Latitude (j) Longitude (l) Latitude (j) Longitude (l)
“G1” 10°00’20,70”N 105°04’02,70”E 10°00’17,06”N 105°04’09,13”E
“G2” 10°00’31,30”N 105°04’19,21”E 10°22’27,66”N 105°04’25,64”E
  • Function: Marking limiting the water area under construction.

CHARACTERISTICS:

  1. Day time:
  • Type of buoy: D = 2,0m
  • Shape: Tower;
  • Color: Yellow;
  • Top-mark:          letter “X” yellow;
  • Code:          “G1”, “G2”, red;
  1. Night time:
  • Light characteristics: yellow light, group flashing (3+1), every 12,0s;
  • Luminous range: 2, 5 NM.

NAVIGATION GUIDANCE:

  • All vessels navigating in Rach Gia fairway, Kien Giang province based on the Notice to Mariners, paper charts, depth and AtoN system and should have methods of safety navigation. Absolutely comply with the regulation of Kien Giang Maritime Administration for maritime safety./.
  • More information contact The Management Board signs the transport construction investment project of Kien Giang province.
SIGN ON BEHALF OF DIRECTOR GENERAL

DEPUTY DIRECTOR GENERAL

Signed and Sealed

 

Pham Tuan Anh


Other notice

The parameters depth of the waters in front of the import cargoes 15.000DWT Quay and the export cargoes 500 DWT Quay of Thang Long Cement Grinding Station in Hiep Phuoc Industrial Park, Nha Be district, HCMCHCM – 21 – 2024

Depth of waters in morring buoy and turning basin Vung Ro petro port

Depth of Dinh An-Can Tho fairway, section from buoys “0” to “16”

(Vietnamese) Thông số kỹ thuật của luồng hàng hải An Thới: Độ sâu sau nạo vét của đoạn luồng thiết kế Nạo vét duy tu năm 2014

Depth of shallow sections Ganh Rai Bay, Dan Xay, Kervella, L’est Peak, Propontis, Da Han, Buoy “58”, Navioil, P71-DT83, turning basin VQ01, turning basin VQ02 of Saigon – Vung Tau fairway in 2019