Wednesday, 01/04/2020

Notice to Mariners

The new establishment of specialized buoys “HP1”, “HP2” serving dredging construction of Hiep Phuoc Power Co., Ltd

NOTICE TO MARINERS

The new establishment of specialized buoys “HP1”, “HP2” serving dredging construction of Hiep Phuoc Power Co., Ltd

No. 19/TBHH-TCTBĐATHHMN dated February 19, 2020

HCM – TG – 07 – 2020

  • Waters: Hồ Chí Minh city
  • Fairway: Soài Rạp

- Buoy:      “HP1”, “HP2”

VMS-South would like to inform that: The new establishment of specialized buoys “HP1”, “HP2” serving dredging construction of Hiep Phuoc Power Co., Ltd:

- Position: Construction area Dredging water area port of Hiep Phuoc Power Co., Ltd.

- Coordinates:

Buoy VN-2000 WGS-84
Latitude (j) Longitude (l) Latitude (j) Longitude (l)
“HP1” 10°38’42,7”N 106°45’00,2”E 10°38’39,1”N 106°45’06,7”E
“HP2” 10°38’38,7”N 106°45’11,5”E 10°38’35,0”N 106°45’17,9”E
  • Function: Marking dredging construction of Hiep Phuoc Power Co., Ltd.

CHARACTERISTICS:

  1. Day time:
  • Diameter: 2,0m;
  • Shape: Tower;
  • Color: Yellow;
  • Top-mark:           Letter “X” yellow;
  • Code: Letter :“HP1”, “HP2”, red;
  1. Night time:
  • Light characteristics: Yellow light, group flashing (3+1), every 12,0s;
  • Luminous range: 2,5 NM.
  • NAVIGATION GUIDANCE:

All vessels navigating in Soài Rạp fairway based on the Notice to Mariners, paper charts, depth and AtoN system and should have methods of safety navigation.  Absolutely comply with the regulation of Hồ Chí Minh Maritime Administration for maritime safety./.

More information contact Hiep Phuoc Power Co., Ltd.

ON BEHALF OF DIRECTOR GENERAL

DEPUTY DIRECTOR GENERAL

Signed and Sealed

 

Pham Tuan Anh


Other notice

Depth of Dam Son fairway

Depth of waters in front of Đầm Môn wharf – Khánh Hòa province

Pull PVD VI drilling platform from Block 09-2/09 to position H18 on Vung Tau

Completion of salvage and relocation of sunk SG 8193 barges on Dong Tranh – Go Gia fairway

Depth of Phu Quy fairway