NOTICE TO MARINERS
The new establishment of specialized buoy “NV1” và “NV2″ controlling the construction area to maintain and maintain fairway for large tonnage vessels entering the Hau River in 2018
No. 98/TBHH-TCTBĐATHHMN dated May 23, 2019
TVH – 09-2019
Waters: Trà Vinh.
Fairway: Hậu river.
Buoy: “NV1”, “NV2″.
VMS-South would like to inform that The new establishment of specialized buoy “NV1” và “NV2″ as follow:
- Position: section is on Quan Chánh Bố channel belong to big fairway into Hậu river, as follow:
+ Buoy “NV1”: on right fairway, downstream of beacon “37” – 210m, upstream of ferry Láng Sắt.
+ Buoy “NV2”: on right fairway, downstream of beacon “23” – 850m, opposite to Long Khánh.
- Coordinates:
Buoy | VN-2000 | WGS-84 | ||
Latitude (j) | Longitude (l) | Latitude (j) | Longitude (l) | |
“NV1” | 09037’48,6”N | 106025’25,4”E | 09037’44,9”N | 106025’31,8”E |
“NV2” | 09036’58,3”N | 106018’18,9”E | 09036’54,7”N | 106018’25,3”E |
- Function: Signaling the maintenance dredging area, marking 02 ends of the main construction area.
CHARACTERISTICS:
Day time:
- Diameter: 2,0m;
- Shape: Spar;
- Color: Yelow;
- Top-mark: letter “X” yellow;
- Number: “NV1”, “NV2″ red color on yellow background;
Night time:
- Light characteristics: yellow light, group flashing (3+1), every 12s;
- Lumious range: 2,5 NM.
NAVIGATION GUIDANCE:
All vessels navigating on the section of Quan Chanh Bo channel belong to fairway for large tonnage vessels entering the Hau River when passing through the maintenance dredging area marked by the above signs of strengthening the realm, absolutely comply with the mobilization of regulatory forces on the site for maritime safety.
ON BEHALF OF DIRECTOR GENERAL DEPUTY DIRECTOR GENERAL
Signed and Sealed
Tran Duc Thi |