Wednesday, 27/10/2021

Notice to Mariners

The new establishment of specialized buoy “NV1” và “NV2″ controlling the construction area to maintain and maintain fairway for large tonnage vessels entering the Hau River in 2018

NOTICE TO MARINERS

The new establishment of  specialized buoy “NV1” và “NV2″ controlling the construction area to maintain and maintain fairway for large tonnage vessels entering the Hau River in 2018

No. 101/TBHH-TCTBĐATHHMN dated May 23, 2019

TVH – 09-2019

Waters: Trà Vinh.

Fairway: Hậu river.

Buoy:  “NV1”, “NV2″.

VMS-South would like to inform that The new establishment of  specialized buoy “NV1” và “NV2″ as follow:

- Position: section is on Quan Chánh Bố channel belong to big fairway into Hậu river, as follow:

+ Buoy “NV1”: on right fairway, downstream of beacon “37” – 210m, upstream of ferry Láng Sắt.

+ Buoy “NV2”: on right fairway, downstream of beacon “23” – 850m, opposite to Long Khánh.

- Coordinates:

Buoy VN-2000 WGS-84
Latitude (j) Longitude (l) Latitude (j) Longitude (l)
“NV1” 09037’48,6”N 106025’25,4”E 09037’44,9”N 106025’31,8”E
“NV2” 09036’58,3”N 106018’18,9”E 09036’54,7”N 106018’25,3”E

- Function: Signaling the maintenance dredging area, marking 02 ends of the main construction area.

CHARACTERISTICS:

Day time:

- Diameter:              2,0m;

- Shape:                  Spar;

- Color:                   Yelow;

- Top-mark:   letter “X” yellow;

- Number:               “NV1”, “NV2″ red color on yellow background;

Night time:

- Light characteristics: yellow light, group flashing (3+1), every 12s;

- Lumious range:     2,5 NM.

NAVIGATION GUIDANCE:

All vessels navigating on the section of Quan Chanh Bo channel belong to fairway for large tonnage vessels entering the Hau River when passing through the maintenance dredging area marked by the above signs of strengthening the realm, absolutely comply with the mobilization of regulatory forces on the site for maritime safety.

This Notice to Mariner replaces the Notice to Mariner No. 98/TBHH-TCTBĐATHHMN dated 14/5/2019 of VMS-South about The new establishment of  specialized buoy “NV1” và “NV2″ controlling the construction area to maintain and maintain fairway for large tonnage vessels entering the Hau River in 2018./.

ON BEHALF OF DIRECTOR GENERAL

DEPUTY DIRECTOR GENERAL

Signed and Sealed

 

Tran Duc Thi


Other notice

Execution area: Tran Hung Dao vessel is used to execute maintenance dredging on Dinh An-Can Tho fairway 2016

Recovery of operation of AtoN AIS installed in buoy “GR” on Vung Tau-Thi Vai fairway

The opening of CV001 underground valve on gas pipeline 16A Bach Ho – Dinh Co, CCP area of ​​CCP Bach Ho

Depth of mooring waters SOWATCO – TL09, SOWATCO – ĐT1, SOWATCO – ĐT3 wharf

(Vietnamese) Độ sâu vùng nước 02 Ụ tàu của Trạm nghiền Phú Hữu