Monday, 13/01/2025

Notice to Mariners

The new establishment of AtoN specialized buoys named “MS12-6”, “MS12-12” serving the construction of the sand mine belongs to Group 3, river sand exploration area in An Lac Tay commune, Ke Sach district, Soc Trang province (signed MS12).

NOTICE TO MARINERS

The new establishment of AtoN specialized buoys named “MS12-6”, “MS12-12” serving the construction of the sand mine belongs to Group 3, river sand exploration area in An Lac Tay commune, Ke Sach district, Soc Trang province (signed MS12).

No.287/TBHH-TCTBĐATHHMN dated November 11, 2024

STG – TG – 15 – 2024

- Waters: Soc Trang Province.

- Fairway: Dinh An – Hau River.

- AtoN specialized buoys named: “MS12-6”, “MS12-12”.

 

 

VMS-South would like to inform that the new establishment of AtoN specialized buoys named “MS12-6”, “MS12-12” serving the construction of the sand mine belongs to Group 3, river sand exploration area in An Lac Tay commune, Ke Sach district, Soc Trang province (signed MS12) with the following details:

- The position for establishment of marks: Group 3, river sand exploration area in An Lac Tay commune, Ke Sach district, Soc Trang province.

- Geographical coordinates:

No. AtoN

specialized buoys

VN-2000 WGS-84
Latitude (φ) Longitude (λ) Latitude (φ) Longitude (λ)
1 “MS12-6” 09˚50’18,01”N 106˚00’26,85”E 09˚50’14,36”N 106˚00’33,27”E
2 “MS12-12” 09˚51’15,30”N 105˚59’38,79”E 09˚51’11,65”N 105˚59’45,21”E

- Function: Limited the construction of the sand mine belongs to Group 3, river sand exploration area in An Lac Tay commune, Ke Sach district, Soc Trang province.

  1. Day time:

- Shape: Lattice tower.

- Type of buoy: Dimension 2,0m.

- Color: Yellow.

- Number sign: Letters “MS12-6”, “MS12-12” in red.

- Topmark: Letter “X” in yellow.

- Total height: 4,7m from topmark to surface.

  1. Night time:

- Light characteristics: Yellow light, flashing group (3+1) every 18s.

- Lighting scope: 360°.

- Focal plane height: 3,9m from topmark to surface.

- Luminous range: 2,5 NM with T= 0,74.

NAVIGATION GUIDANCE:

All vessels navigating on Dinh An – Hau River fairway, pay attention to AtoN buoys mentioned above, applying keep watching, avoiding conllision with the construction means and absolutely comply with the appointment of Maritime Administration of Can Tho for maritime safety.

Để biết thêm thông tin chi tiết, liên hệ với Ban điều hành Trường Sơn 12 – Tổng công ty Xây dựng Trường Sơn ([1])./.

([1]) Tổ chức cung cấp số liệu, thông tin phục vụ việc công bố thông báo hàng hải chịu trách nhiệm trước pháp luật về sự chính xác của số liệu, thông tin mình cung cấp theo khoản 3, điều 47, Nghị định số 58/2017/NĐ-CP.


Other notice

Depth of waters in front of 20.000DWT Phu Huu cement grinding station

Repairing defective points on oil pipe 16” Bach Ho – Long Hai and repaired survey of concrete cracking points on oil pipe 12”

The new establishment of specialized buoys named “SG1”, “SG2”, “BP” serving the construction of dredging and maintenance of Sai Gon – Vung Tau fairway in 2022

Repairing wharf 7, 8, 9 of Vietsovpetro Port

Execution construction works area: Dredging maintenance of Soai Rap – Hiep Phuoc in 2016