Thursday, 20/03/2025

Notice to Mariners

The new establishment of AtoN buoy no. “10” on Vung Tau – Thi Vai fairway which belongs to the investment construction of upgrading Cai Mep – Thi Vai fairway route project from AtoN buoy no. “0” entry of Cai Mep Container wharf

NOTICE TO MARINERS

The new establishment  of AtoN buoy no. “10” on Vung Tau – Thi Vai fairway which belongs to the investment construction of upgrading Cai Mep – Thi Vai fairway route project from AtoN buoy no. “0” entry of Cai Mep Container wharf

130/TBHH-TCTBĐATHHMN dated June 06, 2024

VTU – TG – 25 – 2024

Waters: Ba Ria – Vung Tau Province

Fairway: Vung Tau – Thi Vai

AtoN buoy no.: “10”

VMS-South would like to inform that the new establishment  of AtoN buoy no. “10” on Vung Tau – Thi Vai fairway which belongs to the investment construction of upgrading Cai Mep – Thi Vai fairway route project from AtoN buoy no. “0” entry of Cai Mep Container wharf with the following details:

- The position for establishment of AtoN mark: Vung Tau – Thi Vai fairway

- Geographical coordinates:

AtoN buoy no. VN-2000 WGS-84
Latitude (φ) Longitude (λ) Latitude (φ) Longitude (λ)
“10” 10°22’37,48”N 107°02’12,50”E 10°22’33,81”N 107°02’18,95”E
  • Function: a mark (or buoy) which is to be right to the port hand when approaching from the open sea or in general proceeding in the direction of the main stream of flood tide, or in the direction established by the appropriate authority , vessels can navigate to the starboard hand side of fairway.
  1. Day time
  • Shape: Lattice tower;
  • Type of buoy: Dimension 2,4 m;
  • Total of height tower: 8,255 m ;
  • Color: Red;
  • Topmark: Single red cylinder (can);
  • Number sign: Letter “10”, in white;
  • Geographical range: 1,5 ≤ R ≤ 1,8 (NM).
  1. Night time
  • Light characteristics: Red light, flashing every 3,0 s;
  • Lighting scope: 3600;
  • Focal plane height: 4,163 m from topmark to the surface;
  • Luminous range: 5,0 NM with T = 0,74.

NAVIGATION GUIDANCE

All vessels navigating on Vung Tau – Thi Vai fairway pay attention to AtoN marks with characteristics mentioned above, navigating following the fairway route, following the guidance of AtoN system and absolutely comply with the appointment of Maritime Administration of Vung Tau and VTS Center for maritime safety.

For further information, please contact directly to Maritime PMU ([1])./.

([1]) Tổ chức cung cấp số liệu, thông tin phục vụ việc công bố thông báo hàng hải chịu trách nhiệm trước pháp luật về sự chính xác của số liệu, thông tin mình cung cấp theo khoản 3, điều 47, Nghị định số 58/2017/NĐ-CP.


Other notice

Depth of waters for large tonnage vessels in Hau river

Termination of buoy “13” on the fairway Saigon – Vung Tau

About the construction works area Invest in OPGW fiber-optic cable route crossing Hau river, Cu Lao Dung district – VNPT Soc Trang cross the fairway in 2021

Specifications on the depth of the fairway at Ben Dam Port – Con Dao

Depth of waters on Tiền river