Thursday, 20/03/2025
Sorry, this entry is only available in Vietnamese.
Changing light characteristics of leading lights on Dinh River fairway
The stopped operation of AtoN specialized buoys named “SH1”, “SH2”, “SH3” marking the construction of dumping waste which belongs to the maintenance and dredging fairway for large load ships entry of Hau River in 2023
Depth of waters in front of wharfs in NASOS
(Vietnamese) Độ sâu vùng nước trước cầu cảng PV GAS Vũng Tàu trên luồng sông Thị Vải
Depth of waters in front of wharf No. 2 – Long An Interenational port