Friday, 29/03/2024

Notice to Mariners

Depth of Nha Trang fairway

NOTICE TO MARINERS

Depth of Nha Trang fairway

No. 40/TBHH-TCTBĐATHHMN dated March 20,2019

KHA – 05 – 2019

Watersn:        Khánh Hòa province.

Fairway:        Nha Trang.

VMS-South would like to inform that:

  1. Wihtin surveyed at Nha Trang fairway is limited and guided by AtoN system with 11,0km in length, 200m in width, depth in meters to Chart Datum:

- North of  Nha Trang fairway (from buoy “0” to buoy “2”) 4,1km in length: depth in meters to Chart Datum is over 9,9 m.

- South of Nha Trang fairway (from buoy “0” to buoy “4”) 6,9km in length: depth in meters to Chart Datum is over 10,6m.

  1. Within surveyed waters in front of Nha Trang port is limited by buoy “3” in North of Nha Trang fairway to buoy “4” in South of Nha Trang fairway, depth in meters to Chart Datum is over 7,9m.

NAVIGATION GUIDANCE:

All vessels navigating on Nha Trang fairway should follow Notice to Mariners, paper chart and AtoN system to have methods of safety navigation, and absolutely comply with the Administration of Nha Trang city for maritime safety./.

ON BEHALF OF DIRECTOR GENERAL

DEPUTY DIRECTOR GENERAL

Signed and Sealed

 

Pham Tuan Anh


Other notice

Stop operation of special buoys named “BP”, “SG1″, “SG2″, “SR1”, “SR2” in the construction area of dredging and maintenance of Sai Gon-Vung Tau, Soai Rap (Hiep Phuoc section) fairways in 2021

(Vietnamese) Thông số kỹ thuật độ sâu các đoạn cạn luồng Sài Gòn – Vũng Tàu.

The construction activities on Dinh An – Song Hau fairway (section from buoy No. “0” to buoy No. “12”) to take advantage of the depth of running vessels expected

49/TBHH-TCTBĐATHHMN – Activity on Binh Thuan Province sea

Depth of waters in front of 20.000DWT wharf at Phu Huu cement