Monday, 13/01/2025

Notice to Mariners

13/TBHH-TCTBĐATHHMN – The operation of Key Hawai drilling rigs

NOTICE TO MARINERS

The operation of Key Hawai drilling rigs

BTN – 01 – 2012

– Sea area: Binh Thuan Province.

On behalf of Ministry of Transport, Southern Vietnam Maritime Safety Corporation notifies that:

The Key Hawaii drilling rig will be pulled from oil-well 09-2/09-KNT-2X to oil-well 01/10&02/10-HX-2X, with detail as follow:

1. Origin point:

Lat:                09053’46,904”                      N

Long:             108021’52,33”                      E

2. Operation point:

Lat:                 10039’20,562”                     N

Long:              108030’18,468”                   E

(The co-ordinate is in WGS-84 provided by PVEP POC)

3.  Characteristics of KeyHawai drilling rig:

+ Type of rig: Jack up rig.

+ Nationality: Vanuatu.

+ Call sign: YJUK4.

+ Dimension: 07,05m x 59,00m x 7,11m.

+ Night signal: Signal lights accordance with maritime regulations.

+ Color: Grey, white.

+ Flag: Vanuatu.

4. Estimated working time:

– Started pulling time: 17th Feb, 2012.

– Operating time: From 18th Feb, 2012 to 3rd May, 2012.

Navigating guidance:

All vessel sailing in Binh Thuan Sea should pay attention when sailing close the KeyHawai drilling rig, apply reasonable measure of navigation to ensure traffic safety and keep away 02 NM from the operation point mentioned above.


Other notice

The parameters depth of the waters in front of Shipping Industrial Wharf of Saigon Shipbuilding Industry Co., Ltd

Depth of waters in morring buoy wharves SSV01 and SSV02 of SSV Ltd., Co (SSV Corp)

Technical specifications Trieu Duong light-house – Binh Thuan province

The parameters depth of the waters in front of the wharf 20.000 DWT and và 500 DWT barge wharf of the Hiep Phuoc Ciment specialized port – Nghi Son Ciment Company

The stopped operation of AtoN specialized buoys named “P1”, “P2” marking the construction of the waters in front of Phuoc An wharf