NOTICE TO MARINERS
Dredging and maintenance of waters in front of Cai Mep International Port
No. 249/TBHH-TCTBĐATHHMN dated November 04, 2022
VTU - 51 – 2022
Waters: Ba Ria-Vung Tau Province.
Fairway: Vung Tau – Thi Vai.
VMS-South would like to inform that Dredging and maintenance of waters in front of Cai Mep International Port limited by points with coordinates as follows:
Points | WGS-84 | |
Latitude | Longitude | |
A | 10030’44,73” N | 107000’41,92” E |
B | 10030’44,08” N | 107000’39,83” E |
C | 10031’03,97” N | 107000’50,47” E |
D | 10031’01,93” N | 107000’51,12” E |
- Execution time: 75 days from the date the vehicle is licensed to operate, excluding the time to stop construction for exploitation or other reasons (expected from November 2022 to January 2023).
- Characteristics of construction means: pump dredger, Execavator bucket wire, Tugboat and Barge.
NAVIGATION GUIDANCE
All means navigating on Vung Tau-Thi Vai fairway pay attention to reduce speed, keep watching, and absolutely comply with appointment of Maritime Administration of Vung Tau for maritime safety./.