NOTICE TO MARINERS
The construction area of the water dredging project in front of the wharf No. 2 and the wharf No. 3 of Cai Mep Thuong container port (TCIT)
No. 294/TBHH-TCTBĐATHHMN dated December 16, 2022
VTU – 57 – 2022
Waters: Ba Ria – Vung Tau province.
Fairway: Vung Tau – Thi Vai.
VMS-South would like to inform that Notice the construction area of the water dredging project in front of the wharf No. 2 and the wharf No. 3 of Cai Mep Thuong container port (TCIT):
Point | VN-2000 | WGS-84 | ||
Latitude | Longitude | Latitude | Longitude | |
1 | 10032’06,7” N | 107001’34,9” E | 10032’03,0” N | 107001’41,3” E |
2 | 10032’25,8” N | 107001’37,3” E | 10032’22,1” N | 107001’43,7” E |
3 | 10032’26,1” N | 107001’34,7” E | 10032’22,4” N | 107001’41,1” E |
4 | 10032’10,5” N | 107001’32,8” E | 10032’06,8” N | 107001’39,2” E |
5 | 10032’04,2” N | 107001’29,0” E | 10032’00,5” N | 107001’35,4” E |
- The construction time is 65 days from the start of the construction.
- Characteristics of the construction vehicles, cranes, slaughters carrying mud, and tugboats.
NAVIGATION GUIDANCE
All vessels navigating on Vung Tau – Thi Vai fairwaypay attention to special buoys mentioned above, ensure to keep safe distance, keep watching, keep communication smoothly, absolutely comply with appointment of Maritime Administration of Vung Tau.