Monday, 10/02/2025

Notice to Mariners

Construction area of ​​Tan Phu Dong Wind Power Plant 1

NOTICE TO MARINERS

Construction area of ​​Tan Phu Dong Wind Power Plant 1

No. 190/TBHH-TCTBĐATHHMN dated August 08 ,2022

 

TGG – 04 – 2022

- Waters: Tien Giang

-Fairway: Tien river

VMS-South would like to inform that Establishment Construction area of ​​Tan Phu Dong Wind Power Plant 1:

Point VN-2000 WGS-84
Latitude Longitude Latitude Longitude
I Project boundaries
1 10˚12’53,54″N 106˚50’57,47″E 10˚12’49,85″N 106˚51’03,88″E
2 10˚10’56,79″N 106˚50’57,07″E 10˚10’53,10″N 106˚51’03,48″E
3 10˚10’09,16″N 106˚53’53,27″E 10˚10’05,47″N 106˚53’59,69″E
4 10˚12’00,83″N 106˚54’21,42″E 10˚11’57,14″N 106˚54’27,83″E
5 10˚12’32,88″N 106˚52’27,41″E 10˚12’29,19″N 106˚52’33,82″E
II Center of underground cable
A 10˚13’39,53″N 106˚48’34,46″E 10˚13’35,86″N 106˚48’40,88″E
B 10˚15’31,18″N 106˚48’13,94″E 10˚15’27,51″N 106˚48’20,36″E
C1 10˚16’03,25″N 106˚47’05,00″E 10˚15’59,58″N 106˚47’11,42″E
C2 10˚16’34,47″N 106˚45’57,61″E 10˚16’30,80″N 106˚46’04,03″E
D 10˚12’27,02″N 106˚51’07,54″E 10˚12’23,35″N 106˚51’13,96″E
E 10˚12’08,11″N 106˚52’27,30″E 10˚12’04,44″N 106˚52’33,72″E
F 10˚11’42,61″N 106˚53’59,58″E 10˚11’38,94″N 106˚54’06,00″E

Estimated construction time is about 245 days.

The means to participate in the construction of the barge and the tug of ships.

NAVIGATION GUIDANCE:

Vessels navigating on fairway from the sea side to the level of the pair of buoys “01” and “02” notify Tien River Station No. 1 on VHF channel 10 for instructions.

Vessels navigating on fairway from the inside out to the level of the pair of buoys “19” and “20” notify Tien River Station No. 2 on VHF channel 10 for instructions.

The section of fairway with limited travel is calculated from 300 m upstream to 300 m downstream of the construction area of ​​the 33 Kv underground cable crossing the fairway.

  • The means of navigation in the waters of Tien Giang province, the Song Tien navigation channel through the construction area with the coordinates mentioned above should be noted to reduce speed and increase vigilance; absolutely comply with the maneuvers of the Maritime Administration of Ho Chi Minh City, the traffic regulation force at the scene and perform collision avoidance according to regulations to ensure maritime safety.

More information contact to Tien Giang Wind Power Joint Stock Company


Other notice

Depth of waters in front of wharf 20.000DWT Vietnam Vegetable Oils Industry Corporation – Acting As Joint Stock Company

Pull of PV Drilling VI drilling rig from H18 position- Vung Tau sea to Rong Doi oil field, 11-2 block

Surveying the current situation of buried pipes in the ashore from KP101 to KP106,515 of BH-LH gas pipeline in 2020

Depth after maintenance dredging of shallow area in Ganh Rai Bay, Kervella, L’est Cape, Propontis, P71 – ĐT83, buoy “58”, turning basin VQ1, VQ2

Depth of waters in front of wharf 20.000 DWT in Navioil port