The package CM-XL03 construction area: Improvement, upgrading equipment and AtoN marks serving the dividing fairway working which belongs to the upgrading Cai Mep-Thi Vai fairway route construction project from AtoN buoy no. “0” entry of Cai Mep Container Terminal

NOTICE TO MARINERS

The package CM-XL03 construction area: Improvement, upgrading equipment and AtoN marks serving the dividing fairway working which belongs to the upgrading Cai Mep-Thi Vai fairway route construction project from AtoN buoy no. “0” entry of Cai Mep Container Terminal

No. 81/TBHH-TCTBĐATHHMN dated April 10th, 2024

VTU – 09 – 2024

Waters: Ba Ria – Vung Tau Province

Fairway: Vung Tau – Thi Vai, Sai Gon – Vung Tau, Dinh River

VMS-South would like to inform that the package CM-XL03 construction area: Improvement, upgrading equipment and AtoN marks serving the dividing fairway working which belongs to the upgrading Cai Mep-Thi Vai fairway route construction project from AtoN buoy no. “0” entry of Cai Mep Container Terminal, as follows:

  1. The adjustment, added establishment AtoN marks area: Vung Tau – Thi Vai fairway from AtoN buoy no. “0” to Phuoc An Port area.
    • The adjustment of 32 AtoN buoys with coordinates as follows:
No. AtoN buoys no. Coordinates of moving position

(WGS84)

Moving distance (m) Note
Latitude Longitude
1 0 10˚16’31,91″N 107˚05’18,85″E 909
2 1 10˚17’31,95″N 107˚04’55,00″E 211
3 2 10˚17’17,70″N 107˚04’32,60″E 2321
4 3 10˚18’34,46″N 107˚04’13,58″E 181
5 4 10˚18’21,54″N 107˚03’50,30″E 2748
6 5 10˚19’49,45″N 107˚03’27,10″E 203
7 6 10˚19’38,95″N 107˚02’59,86″E 3061
8 7 10˚21’21,68″N 107˚03’03,09″E 159
9 8 10˚21’16,38″N 107˚02’37,00″E 2452
10 9 10˚22’36,56″N 107˚02’45,99″E 728
11 11 10°24’46,44″N 107°02’08,73″E 31
12 12 10°24’44,72″N 107°01’47,95″E 79
13 13 10°26’00,62″N 107°00’58,85″E 38
14 14 10°25’50,10″N 107°00’47,63″E 36
15 15 10°26’58,08″N 107°00’04,58″E 40
16 16 10°26’55,10″N 106°59’45,77″E 23
17 17 10°27’35,68″N 106°59’50,64″E 28
18 18 10°27’23,81″N 106°59’34,54″E 36
19 19 10°28’48,11″N 106°59’53,87″E 21
20 20 10°28’47,61″N 106°59’38,40″E 36
21 21 10°30’07,00″N 107°00’02,99″E 65
22 22 10°30’10,81″N 106°59’44,20″E 13
23 24 10°30’55,22″N 107°00’19,47″E 20
24 32 10°32’31,96″N 107°01’28,46″E 31
25 41 10°36’50,32″N 107°00’30,29″E 38
26 43 10°37’18,72″N 106°59’56,44″E 24
27 44 10°34’44,23″N 107°01’19,03″E 34
28 50 10°36’15,53″N 107°01’01,33″E 39
29 52 10°36’25,96″N 107°00’49,83″E 31
30 1 10°23’45,48″N 107°02’54,50″E 148 Luồng Sông Dinh
31 2 10˚24’06,81″N 107˚01’48,80″E 613 Luồng Sài Gòn – Vũng Tàu
32 GR 10°24’35,84″N 107°01’46,12″E 1042
  • The new establishment of 01 AtoN buoy: Preferred channel to port, shape of lattice tower, red color (AtoN buoy no. “10”), Vung Tau-Thi Vai fairway.
  • The new establishment of AIS mark: 20 AtoN buoys integrated with AIS real, synchronized flash be installed on AtoN buoys no.“0”, “1”, “2”, “3”, “4”, “6”, “7”, “8”, “10”, “12”, “13”, “16”, “19”, “22”, “37”, “43”, “48”, “50” on Vung Tau-Thi Vai fairway, AtoN buoy no. “1” on Dinh River fairway and AtoN buoy no. “2” on Sai Gon – Vung Tau fairway; 08 AIS “virtual” in the position of  limited fairway’s edge of the port hand side and starboard hand side of deep water route.
  1. Estimated construction time: 150 days (From February 26, 2024 to July 25, 2024).
  2. The characteristics of construction means: Tug boat and barge crane 100 tons, buoy tender.

NAVIGATION GUIDANCE

All vessels navigating on fairway routes as Vung Tau-Thi Vai, Sai Gon – Vung Tau, Dinh River fairway crossing through the construction site area with coordinates mentioned above, pay attention to keep watching, absolutely comply with the appointment of Maritime Administration of Vung Tau, VTS Center and the regulation force at the site for maritime safety.

For further information, please contact directly to Maritime PMU ([1])./.

([1]) Tổ chức cung cấp số liệu, thông tin phục vụ việc công bố thông báo hàng hải chịu trách nhiệm trước pháp luật về sự chính xác của số liệu, thông tin mình cung cấp theo khoản 3, điều 47, Nghị định số 58/2017/NĐ-CP.


Other notice

Depth of Song Dua fairway

Depth of waters on Vung Ro fairway

Depth of waters in front of port, turning basin and fairway in/out Hydrocarbon port belong to South Vietnam Petrochemical Complex Project

Establishing 02 regulation stations to serve the construction of Phuoc An bridge in Phu My town, Ba Ria – Vung Tau province and Nhon Trach district, Dong Nai province

Depth of waters BP3 anchorage area and BP3 anchorage area on Go Gia river