Saturday, 22/03/2025

Notice to Mariners

New establishment of the downstream, upstream regulation stations (Dong Nai 1, 2 stations) serving the construction of Nhon Trach Bridge crossing the Dong Nai River

NOTICE TO MARINERS

New establishment of the downstream, upstream regulation stations (Dong Nai 1, 2 stations) serving the construction of Nhon Trach Bridge crossing the Dong Nai River

No. 252/TBHH-TCTBĐATHHMN dated November 16, 2022

ĐNA – 09 – 2022

  • Waters: Dong Nai province
  • Fairway: Dong Nai

VMS-South would like to inform that: New establishment of the downstream, upstream regulation stations (Dong Nai 1, 2 stations) serving the construction of Nhon Trach Bridge crossing the Dong Nai River:

Regulation stations  VN-2000  WGS-84
Latitude Longitude Latitude Longitude
Downstream station

(Dong Nai 1)

10°45’43,20”N 106°49’50,00”E 10°45’39,50”N 106°49’56,49”E
Upstream station

(Dong Nai 2)

10°46’41,52”N 106°51’03,51”E 10°46’37,82”N 106°51’10,19”E

NAVIGATION GUIDANCE

All vessels navigating on Dong Nai fairway, through the construction area of ​​Nhon Trach Bridge pay attention to special buoys mentioned above, ensure to keep safe distance, keep watching, keep communication smoothly, absolutely comply with appointment of Maritime Administration of Dong Nai.

More information contact to Project Management Unit My Thuan


Other notice

The construction of maintenance and dredging area of Duyen Hai Power Center Port phase 2 in 2024

Depth of shallow sections of Vung Tau-Thi Vai fairway

Parameters of the section fairway in and out Duyen Hai Power Thermal Center port – Tra Vinh province

Depth of Dinh An – Can Tho fairway

Depth of waters on Dinh An – Hau river fairway, section fairway: from buoy No. “0” to buoy No. “16”