Friday, 19/04/2024

Notice to Mariners

Depth of Dinh An – Can Tho fairway

NOTICE TO MARINERS

Depth of  Dinh An – Can Tho fairway

No. 231/TBHH-TCTBĐATHHMN dated December 9, 2015


TVH – 09 – 2015

Waters: Tra Vinh

Fairway: Dinh An-Can Tho

Southern Vietnam Maritime Safety Corporation would like to inform:

  1. Within the surveyed Dinh An-Can Tho fairway is 100m in width, limited and guided by AtoN system, the section fairway from buoy “0” to buoy “16”, is 17km in length, depth in meter to Chart Datum is as follows:

Shallow points appear at the upstream of buoy “7” +135m with the following coordinates:

Point (m) VN-2000 WGS-84
Latitude (j) Longitude (l) Latitude (j) Longitude (l)
2,2 09027’04,7”N 106026’01,3”E 09027’01,0”N 106026’07,7”E
2,3 09027’05,2”N 106025’58,8”E 09027’01,5”N 106026’05,3”E

Except shallow points mentioned above, depth is 2.4m and over.

  1. Within the surveyed fairway is 200m in width, guided by AtoN system, the section fairway from buoy “16” to Can Tho port, belongs to Dinh An-Can Tho, is 103,1km in length, depth in meter to Chart Datum is 4.1m and over.
  2. Within surveyed fairway is 100m in width, limited by AtoN system, the section fairway from Can Tho port to buoy “109” of Dinh An-Can Tho fairway is 11.6km in length, the depth surveyed by meter to Chart Datum is 9.1m and over.

NAVIGATION GUIDANCE:

All means navigating on Dinh An-Can Tho fairway have to follow AtoN system. Pay attention to above shallow points for maritime safety.


Other notice

Depth of waters in front of SSIT, Tan Thanh Ward, Ba Ria – Vung Tau Province

Removing isolated danger buoy on fairway section indicating the Duyen Hai Power Center Port, Tra Vinh Province

Depth of waters on Song Dinh fairway

The depth of waters in front of Dong Xuyen Industrial Zone, Rach Dua Ward, Vung Tau City, Ba Ria – Vung Tau Province

(Vietnamese) Về việc chấm dứt hoạt động phao chuyên dùng “H3”, “H4” thuộc công trình xây dựng cảng Tổng hợp Vinalines Hậu Giang