NOTICE TO MARINERS
Depth of waters in front of port Phu Huu Cement grinding station
No. 272/TBHH-TCTBĐATHHMN dated November 19 ,2021
HCM – 61 – 2021
waters: Ho Chi Minh city.
Fairway: Dong Nai.
VMS-South would like to infrom that Depth of waters in front of port Phu Huu Cement grinding station :
- Within surveyed waters in front of wharf 20.000 DWT:
Point | VN-2000 | WGS-84 | ||
Latitude (j) | Longitude (l) | Latitude (j) | Longitude (l) | |
N-1 | 10046’50,5” N | 106048’42,2” E | 10046’46,8” N | 106048’48,7” E |
N-2 | 10046’46,6” N | 106048’36,8” E | 10046’42,9” N | 106048’43,3” E |
N-3 | 10046’43,3” N | 106048’36,2” E | 10046’39,6” N | 106048’42,7” E |
N-4 | 10046’50,0” N | 106048’45,5” E | 10046’46,3” N | 106048’52,0” E |
The depth is determined by a 200kHz-frequency reverb to from Datum Chart is 8,6 m.
- Within surveyed waters in front of wharf 1.500 DWT (Dock:
Point | VN-2000 | WGS-84 | ||
Latitude (j) | Longitude (l) | Latitude (j) | Longitude (l) | |
U-1 | 10046’52,8” N | 106048’42,7” E | 10046’49,1” N | 106048’49,1” E |
U-2 | 10046’51,2” N | 106048’42,1” E | 10046’47,5” N | 106048’48,6” E |
N-4 | 10046’50,0” N | 106048’45,5” E | 10046’46,3” N | 106048’52,0” E |
U-3 | 10046’52,2” N | 106048’47,9” E | 10046’48,5” N | 106048’54,3” E |
The depth is determined by a 200kHz-frequency reverb to from Datum Chart is 3,5 m.
Data based on chart symbol XMPH-11/2021 ratio 1/500 was measured by
My Hung Environment And Resources Jsc , completed on November, 2021.
More information contact to Branch of Ha Tien 1 Cement Joint Stock Company – Phu Huu grinding station.