Monday, 28/04/2025

Notice to Mariners

The technical parameters depth of Vung Tau Petroleum Service Port Port, anchorage area, turning basin and the specialized fairway route entry to the 50.000 DWT anchorage harbor which belongs to the Cu Lao Tao petroleum depot project – Eastern PVOIL

 NOTICE TO MARINERS

The technical parameters depth of Vung Tau Petroleum Service Port Port, anchorage area, turning basin and the specialized fairway route entry to the 50.000 DWT anchorage harbor which belongs to the Cu Lao Tao petroleum depot project – Eastern PVOIL

No. 307/TBHH-TCTBĐATHHMN dated December 28, 2023

VTU – 56 – 2023

Waters: Ba Ria – Vung Tau Province.

Fairway: Dinh River.

 

VMS-South would like to inform that the technical parameters depth of Vung Tau Petroleum Service Port Port, anchorage area, turning basin and the specialized fairway route entry to the 50.000 DWT anchorage harbor which belongs to the Cu Lao Tao petroleum depot project – Eastern PVOIL, depth determined echo sounding 200 kHz frequency to chart datum as follows:

  1. Within range of surveyed the anchorage area of the 50.000 DWT anchorage habour, limited by points with coordinates as follows:
Points VN-2000 WGS-84
Latitude Longitude Latitude Longitude
N1 10°24’26,7” N 107°03’15,5” E 10°24’23,0” N 107°03’21,9” E
N2 10°24’18,9” N 107°03’20,3” E 10°24’15,2” N 107°03’26,7” E
N3 10°24’17,4” N 107°03’17,8” E 10°24’13,7” N 107°03’24,2” E
N4 10°24’25,2” N 107°03’13,1” E 10°24’21,5” N 107°03’19,5” E

- Depth is 7,6 m.

  1. Within range of surveyed the specialized fairway entry to the 50.000 DWT anchorage harbor, is 2,5km long, 200m wide, coordinates of the fairway center is limited by points with coordinates as follows:
Points VN-2000 WGS – 84
Latitude Longitude Latitude Longitude
C0 10024’18,4” N 107003’10,8” E 10024’14,7”N 107003’17,2” E
C5 10024’02,3” N 107002’44,3” E 10023’58,6”N 107002’50,7” E
C4 10023’55,9” N 107002’30,6” E 10023’52,2”N 107002’37,0” E
C3 10023’35,3” N 107002’17,3” E 10023’31,6”N 107002’23,7” E
C2 10023’24,8” N 107002’15,4” E 10023’21,1”N 107002’21,8” E

- Depth is 8,1 m.

  1. Within range of surveyed the waters of Vung Tau oil and gas service port division terminal, limited by points with coordinates as follows:
Points VN-2000 WGS-84
Latitude Longitude Latitude Longitude
A1 10°23’34,8” N 107°05’47,4” E 10°23’31,1” N 107°05’53,9” E
A2 10°23’37,1” N 107°05’46,4” E 10°23’33,5” N 107°05’52,8” E
A3 10°23’38,0” N 107°05’49,1” E 10°23’34,4” N 107°05’55,5” E
A4 10°23’38,4” N 107°05’49,4” E 10°23’34,7” N 107°05’55,8” E
A5 10°23’36,1” N 107°05’50,4” E 10°23’32,4” N 107°05’56,9” E

- Depth is 4,5 m.

Depth data is based on contour map symbol PV01_12_23, scale 1/500; PV02_12_23, PV03_12_23, PV04_12_23, scale 1/1000 measured by Vietnam Maritime Construction Investment Consulting Joint Stock Company (MCIC) and completed in December 2023.

For more detailed information, please contact directly with the Branch of Vietnam Oil Corporation – Joint Stock Company – Eastern Petroleum Storage Enterprise. (1)./.


Other notice

Pulling TOS Ha Long ship from Dong Xuyen port to Dai Hung field, Lot 05.1a

Cap vessel (barge) Cable Orchestra and Joyce tugboat to install cable near Quy Nhon coast into Vietnam in ADC cable line

Depth of waters in front of wharf 600cv and 600cv access fairway under the Ben Dam Port Management Board, Con Dao

Survey status of fixing pipeline in the ground from KP.101.000 to KP.106.515 of NPS 16”BH-LH gas pipeline system 2016

(Vietnamese) Về thông số kỹ thuật độ sâu khu nước trước Bến cầu cảng Total Gas Cần Thơ của Công ty TNHH Total Gas Cần Thơ