Tuesday, 29/04/2025

Notice to Mariners

Depth of waters in front of wharf, turning basin belong to investment project to build and upgrade wharf No. 1 – Quy Nhon Port

NOTICE TO MARINERS

Depth of waters in front of wharf, turning basin belong to investment project to build and upgrade wharf No. 1 – Quy Nhon Port

 No. 269/TBHH-TCTBĐATHHMN dated November 15, 2023

BĐH – 08 – 2023

Waters: Binh Dinh province.

Fairway: Quy Nhon.

VMS-South would like to inform that Depth of waters in front of wharf, turning basin belong to Investment project to build and upgrade wharf No. 1 – Quy Nhon Port:

  1. Within surveyed waters in front of wharf No. 1 – Quy Nhon port:
Point  VN-2000  WGS-84
Latitude Longitude Latitude Longitude
K1 13o46’48,78’’ N 109o14’40,66’’ E 13o46’45,06’’ N 109 o14’47,13’’ E
K2 13o46’50,20’’ N 109 o14’42,69’’ E 13 o46’46,48’’ N 109 o14’49,16’’ E
K7 13o47’03,28’’ N 109 o14’33,08’’ E 13 o46’59,56’’ N 109 o14’39,55’’ E
K8 13o47’01,86’’ N 109 o14’31,05’’ E 13 o46’58,14’’ N 109 o14’37,52’’ E

The depth is determined by a 200kHz-frequency reverb to from Datum Chart is 12,23 m.

  1. Within surveyed waters in turning basin – Quy Nhon port:
Point  VN-2000  WGS-84
Latitude Longitude Latitude Longitude
K2 13o 46’50,20’’ N 109 o14’42,69’’ E 13 o46’46,48’’ N 109 o14’49,16’’ E
K3 13o46’52,33’’ N 109 o14’46,22’’ E 13 o46’48,61’’ N 109 o14’52,69’’ E
K4 13o46’48,70’’ N 109 o14’48,46’’ E 13 o46’44,97’’ N 109 o14’54,93’’ E
K5 13o46’51,53’’ N 109 o14’53,27’’ E 13 o46’47,80’’ N 109 o14’59,74’’ E
K6 13o47’02,20’’ N 109 o14’47,12’’ E 13 o46’58,48’’ N 109 o14’53,59’’ E
K7 13o47’03,28’’ N 109 o14’33,08’’ E 13 o46’59,56’’ N 109 o14’39,55’’ E

The depth is determined by a 200kHz-frequency reverb to from Datum Chart is 11,01 m.

  1. Within surveyed and scanned the obstruction that is limitted the poits above. There is no any the obstruction.

Data based on chart symbols CAU1-QMC-11.2023 ratio 1/1000 and RQ CAU1-QMC-11.2023 ratio 1/1000  was measured by Quang Minh Waterway Transportation Construction Company completed on November, 2023.

Furthermore information conatct to Quy Nhon Port Join Stock Company


Other notice

Depth of waters in Phú Quý fairway

(Vietnamese) Về thông số kỹ thuật độ sâu khu nước trước bến cảng ELF gas Sài Gòn của Công ty TNHH Totalenergies LPG Việt Nam

(Vietnamese) Về việc Thiết lập phao báo hiệu hàng hải tại khu vực thi công xây dựng cầu Sài Gòn 2

The stopped operation of the specialized buoy named “DH2” serving the dredging and maintenance construction of Port and the water flow used for cooling turbine of Duyen Hai Electric Power Center in 2024 phase 1

Depth after dredging of shallow area in Ganh Rai Bay, Kervella, L’est Head, Propontis, P71- ĐT83 of Sai Gon – Vung Tau fairway in 2014