Notice to Mariners

Depth of waters in front of upgraded coal port to receive ships with a tonnage of up to 50,000 DWT in Vinh Tan 2 Thermal Power Plant Wharf

NOTICE TO MARINERS

Depth of waters in front of  upgraded coal port to receive ships with a tonnage of up to 50,000 DWT in Vinh Tan 2 Thermal Power Plant Wharf

No. 113/TBHH-TCTBĐATHHMN dated June 5, 2023

BTN – 06 – 2023.

Waters: Binh Thuan province.

Fairway: Vinh Tan.

VMS-South would like to inform that Depth of waters in front of  upgraded coal port to receive ships with a tonnage of up to 50,000 DWT in Vinh Tan 2 Thermal Power Plant Wharf:

  1. Within surveyed waters in front of  upgraded coal port to receive ships with a tonnage of up to 50,000 DWT in Vinh Tan 2 Thermal Power Plant Wharf:
Point  VN-2000  WGS-84
Laitude Longitude Laitude Longitude
KN-01 11°18’34,42″N 108°48’05,77″E 11°18’30,71″N 108°48’12,19″E
KN-02 11°18’31,87″N 108°48’06,32″E 11°18’28,16″N 108°48’12,73″E
KN-03 11°18’34,33″N 108°48’18,13″E 11°18’30,62″N 108°48’24,54″E
KN-04 11°18’36,34″N 108°48’15,00″E 11°18’32,63″N 108°48’21,42″E

- The depth is determined by a 200kHz-frequency reverb to from Datum Chart is 13,70 m.

  1. Within surveyed coordinates above, there is no the obstruction.

Data based on chart symbols KN-CT: 001 ratio 1/500 and RQ-CT: 001 tỷ lệ 1/500 wasmeasured by Waterway Construction Consultants Joint Stock Company, completed on May, 2023.

More information contact to Vinh Tan Thermal Power Company


Other notice

The restoration of buoy and obstuctions in the area where the An Phu 868 ship sank in the waters of Binh Thuan

Termination of buoy “H2” on special fairway, Duyen HaiCenter Coastal thermal power factory port – Tra Vinh province

Trying tilt of Tam Đao 05 drilling rig at PV Shipyard waters area

The new establishment of buoy “SĐ01”, “SĐ02” và “SĐ03” Limiting the construction area of ​​construction and installation package No. 1 of the embankment project along Hau river, Vinh Long province

Depth in front of SITV wharf