NOTICE TO MARINERS
Depth of waters front of barge 500 DWT of wharf- Cong Thanh Cement Port
No. 239/TBHH-TCTBĐATHHMN dated October 27, 2022
HCM – 55 – 2022
Waters: Ho Chi Minh city.
Fairway: Sai Gon – Vung Tau.
VMS-South would like to inform that Depth of waters of in front of barge 500 DWT of wharf- Cong Thanh Cement Port:
- Within surveyed waters in front of wharf
Point | VN-2000 | WGS-84 | ||
Latitude | Longitude | Latitude | Longitude | |
A1 | 10039’05,4” N | 106048’42,3” E | 10039’01,8” N | 106048’48,7” E |
A2 | 10039’05,5” N | 106048’41,0” E | 10039’01,8” N | 106048’47,5” E |
A3 | 10038’57,6” N | 106048’43,7” E | 10038’53,9” N | 106048’50,1” E |
A4 | 10038’58,3” N | 106048’44,7” E | 10038’54,6” N | 106048’51,2” E |
The depth is determined by a 200kHz-frequency reverb to from Datum Chart is 2,7 m.
- Within surveyed obstruction that is limited by points above. There is no dangerous obstruction.
Data based on chart symbols XMCT_2210, ratio 1/500; RA_XMCT_2210, ratio 1/500, was measured by Southern Maritime Hydro-Survey Company , completed on October, 2022.
More information contact to Dong Nai Roofsheet & Construction Material Joint Stock Company.