Tuesday, 29/04/2025

Notice to Mariners

Depth of waters front of barge 500 DWT of wharf- Cong Thanh Cement Port

NOTICE TO MARINERS

Depth of waters front of barge 500 DWT of wharf- Cong Thanh Cement Port

No. 239/TBHH-TCTBĐATHHMN dated October 27, 2022

HCM – 55 – 2022

Waters: Ho Chi Minh city.

Fairway: Sai Gon – Vung Tau.

VMS-South would like to inform that Depth of waters of in front of barge 500 DWT of wharf- Cong Thanh Cement Port:

  1. Within surveyed waters in front of wharf
Point  VN-2000  WGS-84
Latitude Longitude Latitude Longitude
A1 10039’05,4” N 106048’42,3” E 10039’01,8” N 106048’48,7” E
A2 10039’05,5” N 106048’41,0” E 10039’01,8” N 106048’47,5” E
A3 10038’57,6” N 106048’43,7” E 10038’53,9” N 106048’50,1” E
A4 10038’58,3” N 106048’44,7” E 10038’54,6” N 106048’51,2” E

The depth is determined by a 200kHz-frequency reverb to from Datum Chart is 2,7 m.

  1. Within surveyed obstruction that is limited by points above. There is no dangerous obstruction.

Data based on chart symbols XMCT_2210, ratio 1/500; RA_XMCT_2210, ratio 1/500, was measured by Southern Maritime Hydro-Survey Company , completed on October, 2022.

More information contact to Dong Nai Roofsheet & Construction Material Joint Stock Company.


Other notice

13/TBHH-TCTBĐATHHMN – The operation of Key Hawai drilling rigs

Depth of waters in front of the area for mooring ships in front of wharf No.3 (wharf A3-10.000 DWT) and wharf 2.000 DWT (wharf A1) – Go Dau A port area in Phuoc Thai commune, Long Thanh district, Dong Nai province

The technical parameters depth of the waters of SCC-VN Nhon Trach port

Depth of waters in front of POSCO SS – VINA port on Thi Vai river

Depth of waters in Rach Gia fairway