Tuesday, 13/05/2025

Notice to Mariners

The parameters depth of the turning basin waters area which serving the exploitation of wharfs no. 5 and 6 of Phuoc An Port

 NOTICE TO MARINERS

The parameters depth of the turning basin waters area which serving the exploitation of wharfs no. 5 and 6 of Phuoc An Port

 No.181/TBHH-TCTBĐATHHMN dated July 22, 2024

ĐNA – 08 – 2024

Waters: Dong Nai Province

Fairway: Vung Tau – Thi Vai

VMS-South would like to inform that the parameters depth of the turning basin waters area which serving the exploitation of wharfs no. 5 and 6 of Phuoc An Port with the following details:

  1. Within range of surveyed the turning basin waters area limited by circle has radius of D = 380 m, Center F in the position with coordinates as follows:
The turning basin center VN-2000 WGS-84
Latitude (φ) Longitude (λ) Latitude (φ) Longitude (λ)
F 1037’06,89”N 10700’01,63”E 1037’03,21”N 10700’08,05”E

– Depth determined by echo sounding 200 kHz frequency to chart datum is 11,60 m.

  1. Within range of surveyed and scanned dangers on the fairway limited by points with coordinates mentioned above, there is no any danger detected.

For further information, please contact directly with Petro Vietnam Phuoc An Port Investment & Operation Join Stock Company (1).

Notes: The sounding data is based on the sounding chart signed VQTPA/2024/VQT-01, the scanned data is based on the sounding chart signed VQTPA/2024/RQ-01, scale 1/2.000 supplied by Petro Vietnam Phuoc An Port Investment & Operation Join Stock Company enclosed with the request no. 1046/PAP-QLDA dated June 18th, 2024./.


Other notice

Depth after maintenance dredging – Shallow sections areas 1, 2, 3 of Vung Tau-Thi Vai fairway in 2015

Depth of waters in front of Phu Đong wharf

The ship VSG-PRIDE ran aground on Quy Nhon fairway

Change Buoy “GR”’s characteristics Vung Tau – Thi Vai fairway

Depth of Nha Trang fairway