NOTICE TO MARINERS

Parameters depth of Ben Dam – Con Dao fairway

No. 324/TBHH-TCTBĐATHHMN dated December 30, 2021

VTU – 68 – 2021

Waters: Ba Ria-Vung Tau

Fairway: Ben Dam – Con Dao.

VMS-South would like to inform that Parameters depth of Ben Dam – Con Dao fairway;

Within range of fairway bottom is 200m wide, limited and guided by AtoN sytem, depth is determined by Echo Sounding frequency 200 kHz to Chart Datum as follows:

  1. Section from buoy no. “0” to the end of the turning basin’s range towards to Ben Dam port, is 3,4 km long, depth is 7,7 m.
  2. Within range of turning basin limited by the circle with diameter D=400 m, center O at the position with coordinates:
Points VN-2000 WGS-84
Latitude (j) Longitude (l) Latitude (j) Longitude (l)
O 08039’26,3” N 106033’49,0” E 08039’22,6” N 106033’55,4” E

 – Depth is 7,8 m.

 

NAVIGATION GUIDANCE:

 

All vessels navigating on Ben Dam – Con Dao fairway is based on The Notice to Mariners, The Sounding Chart and the AtoN system for to take method for safe navigation. Absolutely comply with the appointment of Maritime Administration of Vung Tau./.


Other notice

Change light characteristics of Da Trang lighthouse

Removing AtoN buoys “T”, “K” on Vung Tau-Thi Vai fairway

The new establishment of buoy “ĐH1”, “ĐH2”, “ĐH3” serving the construction of Dong Hai Wind Power Plant Project 1

Depth after maintenance dredging of Song Dinh fairway in 2015 No.183/TBHH-TCTBĐATHHMN dated September 25, 2015

The new establishment of three AtoN specialized buoys named “SH1”, “SH2”, “SH3” which marking the dredging and maintenance of the fairway used for large load ships entry of Hau River construction in 2023