NOTICE TO MARINERS
Depth of waters fairway for large tonnage to the Hau River: the depth of the shallow piece had finished construction and maintenance dredging.
No. 170/TBHH-TCTBĐATHHMN dated August 28,2019
TVH – 14 – 2019.
Waters: Trà Vinh province.
Fairway: Hậu river.
VMS-South would like to inform that:
Within the scope of maritime design flow bottom dredging maintenance are 70 metres in width, limited and guided by AtoN of the sections the stream has completed the work of maintenance dredging, insofar as follows:
Quan Chánh Bố fairway:
- Fairway is 3.680m in length from upstream of beacon “30” + 270m to upstream of beacon “34” + 60m;
- Fairway is 1.080m in length from upstream of beacon “36” + 900m to upstream of beacon “38” + 20m.
2- Hậu river: is 1.500m in length from downstream of buoys “45”, “52” – 655m to upstream of buoys “45”, “52” + 845m.
Depth in meters to Chart Datum is 6,5m.
NAVIGATION GUIDANCE:
All vessels navigating on the section of fairway for large tonnage vessels entering the Hau River when passing through the maintenance dredging area marked by the above signs of strengthening the realm, comply strictly with the regulation of Can Tho Maritime Administration for maritime safety.
ON BEHALF OF DIRECTOR GENERAL DEPUTY DIRECTOR GENERAL
Signed and Sealed
Tran Duc Thi |