 NOTICE TO MARINERS

The parameters depth of the fairway for large load ships entry of Hau River

No.276/TBHH-TCTBĐATHHMN dated August 30 th, 2024

TVH – 43- 2024

Waters: Tra Vinh Province.

Fairway: for large load ships entry of Hau River.

 

VMS-South would like to inform that The parameters depth of the fairway for large load ships entry of Hau River with the following details:

Within range of the surveyed and designed fairway’s bottom for dredging and maintenance of the fairway section from AtoN buoy no. “7” – 1030 m (the seadyke area + 400 m) to “7” + 90 m, 1,12 km long, 70 m wide, limited and guided by AtoN system, depth determined by echo sounding 200 kHz frequency to chart datum is 6,42 m.

NAVIGATION GUIDANCE

All vessles navigating on the fairway for large load ships entry of Hau River are based on the issued Notice to Mariners mentioned above and comply with the appointment of Maritime Administration of Can Tho for maritime safety./.


Other notice

Depth of waters in front of Calofic wharf

Depth of waters on Con Son – Con Dao fairway

Depth of waters at mooring buoys SR03, SR04, SR05, BP-SR6A and CT-SR7 transhipment area of Nha Rong JSC

03/TBHH-TCTBĐATHHMN – Characteristic modification of Beacon A and B on QuyNhon fairway

Depth of of waters at mooring buoy BP4; BP8; BP9; BP10; BP11