Tuesday, 26/10/2021

Notice to Mariners

Depth of Dinh An – Can Tho: Depth after maintenance dredging 2015

NOTICE TO MARINERS

Ref: Depth of Dinh An – Can Tho: Depth after maintenance dredging 2015

No. 109/TBHH-TCTBĐATHHMN dated on June 16th, 2015

          TVH – 06 – 2015

  • Waters area: Tra Vinh province
  • Fairway: Dinh An – Can Tho
  • Section: from downstream of buoy “4” – 600m to upper stream of buoy “6” + 1000m; and from downstream of buoy “5A”- 750m to upper stream of buoy “11” + 400m.

VMS-South would to like to inform:

In designed navigation fairway with breadth of 100m, sections from downstream of buoy “4” – 600m to upper stream of buoy “6” + 1000m; and from downstream of buoy “5A”- 750m to upper stream of buoy “11” + 400m, depth in meter to Chart Datum as follows:

The shallowest depth is 3.3m.


Other notice

Construction site: Installing BK Thien Ung platform’s jacket

(Vietnamese) Độ sâu luồng Sài Gòn – Vũng Tàu

Moving Platform PVD VI from Block 09-2/09 to H18 – Vung Tau

Depth of waters in front of berth and fairway ahead of the coal port of Vinh Tan 4 power plant

Scanning obstacle on Dinh An-Can Tho fairway which use for large load vessels navigating in and out Hau river