NOTICE TO MARINERS
Depth of waters on Dong Nai fairway
No. 122/TBHH-TCTBĐATHHMN dated June 01, 2022
HCM – 27 – 2022
Waters: Ho Chi Minh city, Dong Nai province.
Fairway: Dong Nai.
VMS-South would like to inform that:
Within surveyed fairway with the length is 35,7 km, the width is 150 m:
- Section 1: Continuing Sai Gon – Vung Tau fairway in Nha Be, from Mui Den Do to fork of Ong Nhieu channel with the length is 9,5 km, the depth is 8,5 m.
- Section 2: From fork of Ong Nhieu channel to downstream of Dong Nai bridge (150 m from Dong Nai Bridge) with the length is 26,2 km (Section fairway cross Long Thanh bridge area, the length is 1,0 km, With 02 boat compartments, each compartment is 60m wide):
- Section fairway from fork of Ong Nhieu channel to buoy No. “15” + 480 m, with the length is 1,8 km, the depth of center fairway is 8,4 m, the depth is 7,3 m close to left of fairway.
- Section from buoy No. “15” + 480 m to beacon No. “23” – 320 m, with the length is 6,2 km, the depth is 9,3 m, the depth of center fairway is 9,8 m.
- Section from beacon No. “23” – 320 m to buoy No. “27” – 70 m, with the length is 2,4 km, the depth is 4,1 m, the depth of center fairway is 8,1 m
- Section from buoy No. “27” – 70 m to buoy No. “20” – 180 m, with the length is 1,6 km, the depth is 8,5 m, the depth of center fairway is 9,4 m.
- Section from buoy No. “20” – 180 m to buoy No. “20”, with the length is 180 m, the depth is 4,7 m close to left of fairway, the depth of center fairway is 11,7 m.
- Section from buoy No. “20” to buoy No. “26” + 900 m, with the length is 4,36 km:
+ Appearing the depth is 6,9m:
Độ sâu
(m) |
VN-2000 | WGS-84 | ||
Latitude | Longitude | Latitude | Longitude | |
6,9 | 10049’00,9”N | 1060 52’39,2”E | 10048’57,2”N | 1060 52’45,7”E |
+ Other the depth above this depth of fairway is 8,6 m.
- Section from buoy No. “26” + 900 m to buoy No. “28” + 860 m, with the length is 1,6 km, the depth is 6,5 m, the depth of center fairway is 7,1 m.
- Section from buoy No. “28” + 860 m to buoy No. “41”, with the length is 4,43 km, the depth is 3,4 m, the depth of center fairway is 4,1 m.
- Section from buoy No. “41” to downstream of Dong Nai bridger (150 m from Dong Nai Bridge), the length is 3,7 km:
+ The reefs are located on the left of the thread, between the pairs of buoys “E1″, “E2″, the reef encroaching the furthest line 48 m, the minimum depth of the reef encroachment of 1.2 m
Depth
(m) |
VN-2000 | WGS-84 | ||
Latitude | Longitude | Latitude | Longitude | |
1,2 | 10052’12,1”N | 1060 50’37,1”E | 10052’08,4”N | 106006’43,5”E |
+ The reefs exist in the middle of fairway, extending from buoy No. “33” +470 m to buoy No.”33″ +650 m, with the length is 180 m, the underground depth of 4.1 m is scattered garbage
+ Other the depth above this depth of fairway is 4,3 m.
- Within surveyed the turning basin No.01 (in front of Cat Lai port) with the circle D = 356 m, center V1:
Point | VN-2000 | WGS-84 | ||
Latitude | Longitude | Latitude | Longitude | |
V1 | 100 45’49,3”N | 1060 48’04,7”E | 100 45’45,6”N | 106048’11,2”E |
- The depth is 9,0 m.
- Within surveyed the turning basin No. 02 (in fork of Ong Nhieu channel) with the circle D = 300 m, center V2:
Point | VN-2000 | WGS-84 | ||
Latitude | Longitude | Latitude | Longitude | |
V2 | 100 46’54,2”N | 1060 49’09,4”E | 100 46’50,5”N | 106049’15,9”E |
- The depth is 8,5 m.
- Within surveyed the turning basin No. 03 (in front of Dong Nai port) with the ½ circle D = 300 m, center V3:
Point | VN-2000 | WGS-84 | ||
Latitude | Longitude | Latitude | Longitude | |
V3 | 100 53’51,5”N | 1060 50’17,9”E | 100 53’47,9”N | 106050’24,3”E |
- The depth is 10,3 m.
NAVIGATION GUIDANCE:
All means navigating on Dong Nai fairway, pay attention to special buoys mentioned above, navigating following AtoN system, keep watching, keep smoothly communication, and absolutely comply with the appointment of Maritime Administration of Ho Chi Minh and Maritime Administration of Dong Nai./.