The parameters depth of Dong Nai fairway

 NOTICE TO MARINERS

The parameters depth of Dong Nai fairway

119/TBHH-TCTBĐATHHMN dated May 29, 2024

HCM – 19 – 2024

Waters: HCMC, Dong Nai Province.

Fairway: Dong Nai.

 

VMS-South would like to inform that the parameters depth of Dong Nai fairway as follows:

Within range of surveyed the fairway route is 35,7 km, 150 m long, limited and guided by AtoN system, depth determined by echo sounding 200 kHz frequency to chart datum as follows:

  1. Section 1: Continuing Sai Gon – Vung Tau fairway in Nha Be waters, starting Mui Den Do to the conjunction of Ong Nhieu canal is 9,5 km long, depth is 8,6 m.
  2. Section 2: From the conjunction of Ong Nhieu canal to the downstream of Dong Nai Bridge (150 m from Dong Nai bridge) length 26.2 km (the fairway section through Long Thanh bridge area is about 1.0 km long, with 02 navigation compartments, each 60 m wide):

- From the conjunction of Ong Nhieu canal to AtoN buoy no. “15” + 650 m, 1,9 km long:

+ Appears depth points 6,3 m; 6,2 m; 7,0 m in the position with coordinates as follows:

Depths (m) VN-2000 WGS-84
Latitude (φ) Longitude (λ) Latitude (φ) Longitude (λ)
6,3 10046’58,8” N 106049’09,3” E 10046’55,1” N 106049’15,7” E
6,2 10046’58,8” N 106049’10,8” E 10046’55,1” N 106049’17,3” E
7,0 10046’58,5” N 106049’10,7” E 10046’54,8” N 106049’17,2” E

+Except depth points mentioned above, depth is  7,2 m, depth in the fairway center is 8,9 m.

- The fairway section from AtoN buoy no. “15” + 650 m to beacon no. “23” – 250 m, 6,2 km long, depth is 9,6 m.

- The fairway section from beacon no. “23” – 250 m to “23” + 650 m, 900 m long, depth is 3,8 m on close fairway’s edge, depth in fairway center is 10,3 m.

- The fairway section from AtoN buoys no. “23” + 650 m to “27”, 1,7 km long, depth is 6,2 m, depth in fairway center is 7,8 m.

- The fairway section from AtoN buoys no. “27” to “37” + 900 m, 5,9 km long as follows:

+ Appears depth points 7,8 m; 6,3 m in the position with coordinates:

Depths (m) VN-2000 WGS-84
Latitude (φ) Longitude (λ) Latitude (φ) Longitude (λ)
7,8 10047’29,3” N 106051’44,5” E 10047’25,6” N 106051’51,0” E
6,3 10047’30,6” N 106051’44,8” E 10047’27,0” N 106051’51,3” E

+ Except depth points mentioned above, depth is 7,2 m, depth in the fairway center is 8,1 m.

- The fairway section from AtoN buoys no. “37” + 900 m to “28” + 860 m, 1,6 km long, depth is 6,5 m, depth in fairway center is 7,2 m.

- The fairway section from AtoN buoys no. “28” + 860 m to “41”, 4,4 km long:

+ Appears depth points 3,4 m in the position with coordinates:

Depths (m) VN-2000 WGS-84
Latitude (φ) Longitude (λ) Latitude (φ) Longitude (λ)
3,4 10051’49,6” N 106050’45,7” E 10051’45,9” N 106050’52,2” E

+ Except depth points mentioned above, depth is 7,2 m, depth in the fairway center is 4,1 m, depth in fairway center is 5,1 m.

- The fairway section from AtoN buoys no.  “41” to the downstream of Dong Nai Bridge (150 m from Dong Nai bridge), length is about 3.7 km as follows:

+ There exists a reef located on the left side of the fairway, between the pair of BHHH buoys marked “E1″, “E2″, the farthest encroachment on the fairway is 48 m, the depth reaches 1.2 m at the location with the coordinates:

Depth (m) VN-2000 WGS-84
Latitude (φ) Longitude (λ) Latitude (φ) Longitude (λ)
1,2 10052’12,1” N 106050’37,1”E 10052’08,4”N 106050’43,6”E

+ Existing under water rock banks on the center of fairway, from AtoN buoy no. “32” + 320 m to “32” + 500 m, 180 m long, 75 m long, depth is 3,7 m in the position with coordinates as follows:

Depth (m) VN-2000 WGS-84
Latitude (φ) Longitude (λ) Latitude (φ) Longitude (λ)
3,7 10052’56,8” N 106050’29,7”E 10052’53,2”N 106050’36,2”E

+ Except depth points mentioned above, depth is 4,5 m.

  1. Within range of surveyed turning basin no. 01 (in front of Cat Lai Port) is designed as a circle with a diameter of 356 m, center V1 at the coordinates:
Point VN-2000 WGS-84
Latitude (φ) Longitude (λ) Latitude (φ) Longitude (λ)
V1 10045’49,3” N 106048’04,7” E 10045’45,6” N 106048’11,2” E

- Depth is 9,1 m.

  1. Within range of surveyed turning basin no.02 (at the intersection of Ong Nhieu canal) is designed as a circle with a diameter of 300 m, center V2 at the location with coordinates:
Point VN-2000 WGS-84
Latitude (φ) Longitude (λ) Latitude (φ) Longitude (λ)
V2 10046’54,2” N 106049’09,4” E 10046’50,5” N 106049’15,9” E
  • Appears depth points 6,3 m; 6,2 m; 7,0 m in the position with coordinates as follows:
Depth (m) Hệ VN-2000 Hệ WGS-84
Latitude (φ) Longitude (λ) Latitude (φ) Longitude (λ)
6,3 10046’58,8” N 106049’09,3” E 10046’55,1” N 106049’15,7” E
6,2 10046’58,8” N 106049’10,8” E 10046’55,1” N 106049’17,3” E
7,0 10046’58,5” N 106049’10,7” E 10046’54,8” N 106049’17,2” E

- Except depth points mentioned above, depth is 7,6 m.

  1. Within range of surveyed turning basin no.03 (in front of Dong Nai Port) is designed as 1/2 circle with diameter of 300 m, center V3 at the location with coordinates:
Point VN-2000 WGS-84
Latitude (φ) Longitude (λ) Latitude (φ) Longitude (λ)
V3 10053’51,5” N 106050’17,9” E 10053’47,8” N 106050’24,4” E

- Depth is 10,2 m.

NAVIGATION GUIDANCE

All vessels navigating on Dong Nai fairway route based on the Notice to Mariners, the sounding charts and AtoN system for maritime safety. Pay attention to under water rock banks, mobile aquaculture areas mentioned above and absolutely comply with the appointment of Maritime Administrations of HCMC and Dong Nai for maritime safety.


Other notice

(Vietnamese) Về khu vực chuyên dùng: hoạt động lắp đặt thiết bị ngầm tại khu vực mỏ Lan Đỏ – Lan Tây, lô 06.1

The parameters depth of Quy Nhon Pilot Boarding Area

Execution of Binh Khanh Bridge on Soai Rap River belongs to the North-South highway project, Ben Luc – Long Thanh section

Pull PVD VI drilling platform from Block 09-2/09 to position H18 on Vung Tau

Stopped operation of Specialized buoy named “K2” serving the construction of lower altitude of K8 dumping yard