Thursday, 20/03/2025

Notice to Mariners

The parameters depth of Ha Tien fairway.

NOTICE TO MARINERS

The parameters depth of Ha Tien fairway.

No. 30/TBHH-TCTBĐATHHMN dated February 3, 2024

KGG – 01 – 2024

Waters: Kien Giang Province.

Fairway: Ha Tien.

 

VMS-South would like to inform that the parameters depth of Ha Tien fairway with the following details:

Within range of surveyed fairway bottom is 60 m wide, 11,6 km long, limited by AtoN system, depth determined by echo sounding 200 kHz frequency to chart datum as follows:

- The fairway section from AtoN buoy no. “1” – 1700 m, is 6,1 km long, depth is 4,0 m.

- The fairway section from AtoN buoys no. “1” – 1700 m to “6” – 70 m, is 4,3 km long, depth is 2,1 m.

- The fairway section from AtoN buoy no. “6” – 70 m to turning basin, is 1,2 km long, depth is 3,5 m.

NAVIGATION GUIDANCE:

All vessels navigating on Ha Tien fairway based on the Notice to Mariners, the sounding charts, and AtoN system for maritime safety and absolutely comply with the appointment of Maritime Administration of Kien Giang./.

 


Other notice

Regarding the Nile River vessel’s work in the construction of dredging for the adjusted Nam Con Son 2 gas pipeline project

Depth of An Thoi fairway

Depth of waters area in front of wharf Calofic

Depth of waters in front of wharves 2A, 3A, 4A and 1B of Nha Be Petroleum depot

Depth of waters in Dinh an – Hau river fairway, section from buoy No. “21” + 800 m to Goi Lon canal