Wednesday, 11/12/2024

Notice to Mariners

The parameters depth of Soai Rap fairway

NOTICE TO MARINERS

The parameters depth of Soai Rap fairway

No.279/TBHH-TCTBĐATHHMN dated November 04, 2024

HCM – 41 – 2024

Waters: HCMC.

Fairway: Soai Rap.

VMS-South would like to inform that the parameters depth of Soai Rap fairway as follows:

Within range of the surveyed fairway limited and guided by AtoN system, depth determined by echo sounding  200 kHz frequency to chart datum as follows  :

  1. The fairway section from AtoN buoys no. “0” to “15”, “16”, 17,9 km long, the fairway bottom width is 160 m:

- The fairway section from AtoN buoys no.  “0” to “6” – 880 m, 5,9 km long, depth is 8,5 m.

- The fairway section from AtoN buoys no. “6” – 880 m to “6” + 550 m, 1,4 km long, depth is 4,9 m on close the starboard hand side of the fairway, depth at the fairway center is 8,3 m.

- The fairway section from AtoN buoys no.  “6” +550 m to “15”, “16”, 10,4 km long, depth is 8,9 m.

  1. The fairway section from AtoN buoys no. “15”, “16” to the upstream of Container Sai Gon Center (SPCT) wharf, 39,7 km long, , the least fairway bottom’s width is 120 m:

- The fairway section from AtoN buoys no. “15”, “16” to s “17”, “18”, 2,0 km long, depth is 8,5 m.

- The fairway section from AtoN buoys no. “17”, “18” to “25”, “26” – 490 m, 11,0 km long, depth is 8,0 m, depth at the fairway center is 8,4 m.

- The fairway section from AtoN buoys no. “25”, “26” – 490 m to no. “32” + 320 m, 5,2 km long, depth is 8,5 m.

- The fairway section from AtoN buoys no “32” + 320 m to “36” – 830 m, 3,3 km long, depth is 6,1 m, depth at the fairway center is 6,6 m.

- The fairway section from AtoN buoys no. “36” – 830 m to “40” – 550 m, 2,8 km long, depth is 7,4 m.

- The fairway section from AtoN buoys no. “40” – 550 m to “37” – 430 m, 1,8 km long, depth is 8,5 m.

- The fairway section from AtoN buoys no. “37” – 430 m to “51”, 7,2 km long, depth is 9,0 m.

- The fairway section from AtoN buoys no. “51” m to “60” – 180 m, 1,0 km long, depth is 8,1 m.

- The fairway section from AtoN buoy no. “60” – 180 m to the upstream of Container Sai Gon Center (SPCT) wharf, 5,4 km long, depth is 8,8 m.

  1. The fairway section from Container Sai Gon Center (SPCT) Wharf to the upstream of Tan Cang Hiep Phuoc Wharf, 1,9 km long, the least fairway bottom’s width is 120 m, depth is 6,8 m, depth at the fairway center is 7,3 m.
  2. The fairway section from the upstream of of Tan Cang Hiep Phuoc wharf ‘s Turning basin to the conjunction of Binh Khanh (between Soai Rap River and Nha Be River), 7,1 km long, the least fairway bottom’s width is 150 m:

- The fairway section from the upstream of Tan Cang Hiep Phuoc wharf ‘s Turning basin to AtoN buoy no.  “71”  – 50 m, 2,4 km long, depth is 9,0 m.

- The fairway section from AtoN buoys no. “71”  – 50 m to “74” – 170 m, 2,8 km long, depth is 5,1 m.

- The fairway section from AtoN buoy no. “74” – 170 m to the conjunction of Binh Khanh (between Soai Rap River and Nha Be River), 1,9 km long, depth is 6,1 m on close the starboard hand side of AtoN buoy no. “58”, depth at the fairway center is 10,2 m.

NAVIGATION GUIDANCE

All vessels navigating on Soai Rap fairway are based on the Notice to Mariners, the sounding charts and AtoN system to have safety navigation measures. Pay attention to the appointment of Maritime Administration of HCMC./.


Other notice

Conduct construction of dredging works to maintain the Hau river (fairway for large vessels) in 2021

Depth of waters in front of wharf – Ha Long cement grinding station

The parameters depth of the waters in front of the import cargoes 15.000DWT Quay and the export cargoes 500 DWT Quay of Thang Long Cement Grinding Station in Hiep Phuoc Industrial Park, Nha Be district, HCMCHCM – 21 – 2024

Depth of Dinh An – Can Tho fairway, section from buoy “0” to buoy “16”

Depth of waters in the pilot pick-up and drop-off area at Nam Can – Bo De