Notice to Mariners

Depth after maintenance dredging of Soai Rap fairway in 2016

NOTICE TO MARINERS

Depth after maintenance dredging of Soai Rap fairway in 2016

No.07/TBHH-TCTBĐATHHMN dated January 08, 2017

 HCM – 03 – 2017

- Locality: HCM City.

- Fairway: Soai Rap

- Section: From upstream of buoy 70 + 800m to upstream of buoy 73 + 350m (fairway section from upstream of Hiep Phuoc New Port to Binh Khanh junction).

Following former notices no.02/TBHH-TCTBĐATHHMN, dated January 05, 2017; no.05/TBHH-TCTBĐATHHMN, dated January 06, 2017 on parameters depth of Soai Rap fairway which after maintenance dredging in 2016,

Southern Vietnam Maritime Safety Corporation would like to inform:

Range of designed fairway is 150m wide, 1.4km long, limited and guided by Aton system from upstream of buoys “70” + 800m to “73” + 350m (fairway section from from upstream of Hiep Phuoc New Port to Binh Khanh junction) which after maintenance dredging in 2016, depth in meters measured by echo sounder with frequency of 33kHz as follows:

Least depth is 8,5m.


Other notice

Specifications on the depth of the fairway at Con Son – Con Dao

Carry out piling and construction of Cai Mep Gemadept – Terminal Link port on on Vung Tau – Thi Vai fairway

(Vietnamese) Độ sâu khu nước trước Bến phao BP7 trên sông Soài Rạp

The stopped operation of AtoN specialized buoys named “PT1”, “PT2” which limited the construction of Cai Con General Port

Stop operation of AtoN specialized buoys named “SR1”, “SR2”, “BP” serving the construction works: dredging and maintenance of Soai Rap fairway in 2021