Sunday, 27/04/2025

Notice to Mariners

Depth after dredging maintenance in 2016

NOTICE TO MARINERS

Depth after dredging maintenance in 2016

No.05/TBHH-TCTBĐATHHMN dated January 05, 2017

HCM – 02 – 2017

- Locality: HCM City.

- Fairway: Soai Rap.

- Section: From buoy no.“71” to upstream of buoy no.“70” + 800m (fairway section from Hiep Phuoc New Port to Binh Khanh Junction)

Southern Vietnam Maritime Safety Corporation would like to inform:

Within range of designed fairway is 150m in width, 1.2km in length, limited and guided by AtoN system from buoy no.”71” to upstream of buoy no.”70” +800m (belongs to fairway section from Hiep Phuoc New Port to Binh Khanh Junction) depth in meters after dredging to Chart datum defined by echo sounder 200kHz as follows:

Least depth is 8,5m.


Other notice

The parameters depth of Ba Ngoi fairway

Repairing defective points on oil pipe 16” Bach Ho – Long Hai and repaired survey of concrete cracking points on oil pipe 12”

39/TBHH-TCTBĐATHHMN – Regarding the change of the characteristic of aid to navigation buoys Soairap – Hiepphuoc Channel

The parameters depth of Ha Tien fairway

The new establishment of specialized buoy “S1”, “S2”, “S3”, “S4”, “S5”, “S6” service of the maintenance and dredging project of Soai Rap fairway