NOTICE TO MARINERS
Depth after dredging maintenance in 2016
No.05/TBHH-TCTBĐATHHMN dated January 05, 2017
HCM – 02 – 2017
- Locality: HCM City.
- Fairway: Soai Rap.
- Section: From buoy no.“71” to upstream of buoy no.“70” + 800m (fairway section from Hiep Phuoc New Port to Binh Khanh Junction)
Southern Vietnam Maritime Safety Corporation would like to inform:
Within range of designed fairway is 150m in width, 1.2km in length, limited and guided by AtoN system from buoy no.”71” to upstream of buoy no.”70” +800m (belongs to fairway section from Hiep Phuoc New Port to Binh Khanh Junction) depth in meters after dredging to Chart datum defined by echo sounder 200kHz as follows:
Least depth is 8,5m.