Monday, 10/02/2025

Notice to Mariners

Depth of waters in FiCO cement port of Fico Tay Ninh Cement Joint Stock Company Branch – Hiep Phuoc Grinding Station

NOTICE TO MARINERS

Depth of  waters in  FiCO cement port of Fico Tay Ninh Cement Joint Stock Company Branch – Hiep Phuoc Grinding Station

 No. 258/TBHH-TCTBĐATHHMN dated November 14, 2023

HCM – 42 – 2023.

Waters: Ho Chi Minh city.

Fairway: Soai Rap.

VMS-South would like to infrom that Depth of  waters in  FiCO cement port of Fico Tay Ninh Cement Joint Stock Company Branch – Hiep Phuoc Grinding Station:

Trong phạm vi khảo sát khu nước trước Bến cảng được giới hạn bởi các điểm có tọa độ:

Point  VN2000  WGS-84
Latitude Longitude Latitude Longitude
A 10o39’11,47”N 106o44’20,11”E 10o39’07,80”N 106 o44’26,54”E
B 10o39’12,88”N 106o44’21,91”E 10o39’09,21”N 106 o44’28,34”E
C 10o39’09,20”N 106o44’24,86”E 10o39’05,53”N 106 o44’31,29”E
D 10o39’07,79”N 106o44’23,06”E 10o39’04,12”N 106o44’29,49”E

The depth is determined by a 200kHz-frequency reverb to from Datum Chart is 3,54 m.

Data based on chart symbols KS_FiCO_2023 ratio 1/500 was measured by Phuc Anh Construction Investment Consultant Joint Stock Company, completed in November ,2023.

Furthermore information conatct to Fico Tay Ninh Cement Joint Stock Company Branch – Hiep Phuoc Grinding Station.


Other notice

The new establishment of buoys “0”, “1”, “2”, “5”, “7” for fairway Con Son – Con Dao

Depth of waters in front of wharf, section from 9 to 17

The temporary stopped operation of AtoN buoy no. “8” on Nam Can – Bo De fairway

New establishment of Aton system used for execution of flooded prevention by tide of HCM City area

Depth of waters in front of mooring buoy PL02, PL03, PL04, PL05