Sunday, 21/07/2024

Notice to Mariners

Depth of waters in FiCO cement port of Fico Tay Ninh Cement Joint Stock Company Branch – Hiep Phuoc Grinding Station

NOTICE TO MARINERS

Depth of  waters in  FiCO cement port of Fico Tay Ninh Cement Joint Stock Company Branch – Hiep Phuoc Grinding Station

 No. 258/TBHH-TCTBĐATHHMN dated November 14, 2023

HCM – 42 – 2023.

Waters: Ho Chi Minh city.

Fairway: Soai Rap.

VMS-South would like to infrom that Depth of  waters in  FiCO cement port of Fico Tay Ninh Cement Joint Stock Company Branch – Hiep Phuoc Grinding Station:

Trong phạm vi khảo sát khu nước trước Bến cảng được giới hạn bởi các điểm có tọa độ:

Point  VN2000  WGS-84
Latitude Longitude Latitude Longitude
A 10o39’11,47”N 106o44’20,11”E 10o39’07,80”N 106 o44’26,54”E
B 10o39’12,88”N 106o44’21,91”E 10o39’09,21”N 106 o44’28,34”E
C 10o39’09,20”N 106o44’24,86”E 10o39’05,53”N 106 o44’31,29”E
D 10o39’07,79”N 106o44’23,06”E 10o39’04,12”N 106o44’29,49”E

The depth is determined by a 200kHz-frequency reverb to from Datum Chart is 3,54 m.

Data based on chart symbols KS_FiCO_2023 ratio 1/500 was measured by Phuc Anh Construction Investment Consultant Joint Stock Company, completed in November ,2023.

Furthermore information conatct to Fico Tay Ninh Cement Joint Stock Company Branch – Hiep Phuoc Grinding Station.


Other notice

Depth of Hà Tiên fairway

Depth of waters in front of wharf K15B and mooring buoy (BP3, B27A, B27B, B29A, B29B) – Ben Nghe port at Tan Thuan Dong ward, district 7, Ho Chi Minh city

Terminated operation of the specialized buoy “SH1”, “SH2”, “SH3” marking the construction area and the submerged area of ​​the Hau river fairway Dredging work (fairwayfor large ships) in 2021 terminated operations 2021

The means serving the dredging maintenance of Tien river fairway (section from km31+500 to upstream of My Tho Port 500m) project

Depth of waters in front of wharf 20.000 DWT, pillar and mooring buoy BP3 of Sai Gon Shipbuilding And Marine Industry Company Limited