Saturday, 29/02/2020

Notice to Mariners

Depth of water in anchoring area in front of V3V4 bridge – VICT port on Saigon river

NOTICE TO MARINERS

Depth of water in anchoring area in front of V3V4 bridge – VICT port on Saigon river

No. 292/TBHH-TCTBĐATHHMN dated December 27,2019

HCM – 65 – 2019

Waters:      Hồ Chí Minh city

Fairway:    Sài Gòn – Vũng Tàu

VMS-South would like to inform that:

  • Within surveyed water anchoring area in front of V3V4 bridge – VICT port on Saigon river:
Point VN-2000 WGS-84
Latitude (j) Longitude (l) Latitude (j) Longitude (l)
A 10046’23,63”N 106044’03,89”E 10046’19,93”N 106044’10,39”E
B 10046’13,66”N 106044’03,89”E 10046’09,96”N 106044’10,39”E
C 10046’12,30”N 106044’01,50”E 10046’08,60”N 106044’08,00”E
D 10046’25,00”N 106044’01,50”E 10046’21,30”N 106044’08,00”E
  • Depth in meters to Chart Datum is 10,25m.

Data based on paper chart symbolized VICT_12.2019 ratio 1/500 do Viet Nam Long Construction Investment Consulting JSC completed on December 2019.

More information contact to  Viet Nam Long Construction Investment Consulting JSC.

ON BEHALF OF DIRECTOR GENERAL

DEPUTY DIRECTOR GENERAL

Signed and Sealed

 

Pham Tuan Anh


Other notice

The new establishment of Hon Chong lighthouse

Regarding NINA vessels operating dredging of access channels, berths, Hydrocarbon wharf 1 and 2 berths under Package F of the South Vietnam Petrochemical Complex project

Information change of moving Parameswara Platform to plots 01&02/10 to drill Oil Well KNV-4XP, Vietnam Offshore

The position of regulating station No. 1 and 2 for the construction of Package F of the South Vietnam Petrochemical Complex Project

Performing a task of surveying by ROV device and the measurement of electrical resistance for all pipeline routes belongs to the project of Nam Con Son gas pipeline phase 1