Notice to Mariners

Depth of waters in front of wharf, section from 9 to 17

NOTICE TO MARINERS

Depth of waters in front of wharf, section from 9 to 17

No. 122/TBHH-TCTBĐATHHMN dated June 12 ,2020

VTU – 41 – 2020

Waters:   Bà Rịa – Vũng Tàu province.

Fairway:  Sông Dinh.

VMS-South would like to inform that:

  1. Within surveyed waters No.1:
Point VN-2000 WGS-84
Latitude (j) Longitude (l) Latitude (j) Longitude (l)
KN5 10023’29,6” N 107004’58,6” E 10023’25,9” N 107005’05,1” E
KN4 10023’27,4” N 107005’04,8” E 10023’23,7” N 107005’11,3” E
KN3 10023’29,2” N 107005’05,5” E 10023’25,6” N 107005’11,9” E
KN6 10023’31,4” N 107004’59,3” E 10023’27,7” N 107005’05,7” E

The least depth from Datum Chart is 9,4m.

  1. Trong phạm vi khảo sát khu nước số 2, được giới hạn bởi các điểm có tọa độ:
Point VN-2000 WGS-84
Latitude (j) Longitude (l) Latitude (j) Longitude (l)
KN3 10023’29,2” N 107005’05,5” E 10023’25,6” N 107005’11,9” E
KN4 10023’27,4” N 107005’04,8” E 10023’23,7” N 107005’11,3” E
KN1 10023’24,7” N 107005’12,6” E 10023’21,0” N 107005’19,0” E
KN2 10023’26,2” N 107005’14,3” E 10023’22,5” N 107005’20,7” E
KN9 10023’33,8” N 107005’17,0” E 10023’30,1” N 107005’23,4” E
KN8 10023’34,6” N 107005’04,9” E 10023’30,9” N 107005’11,3” E
KN7 10023’36,3” N 107005’01,1” E 10023’32,7” N 107005’07,5” E
KN6 10023’31,4” N 107004’59,3” E 10023’27,7” N 107005’05,7” E

The least depth from Datum Chart is 6,2m.

Data based on paper chart symbolized BV-PTSC9-17 ratio 1/500 was measured by Quangminh waterway transportation construction consultant Co Ltd, completed on June, 2020.

SIGN ON BEHALF OF DIRECTOR GENERAL

DEPUTY DIRECTOR GENERAL

Signed and Sealed

 

Pham Tuan Anh


Other notice

(Vietnamese) Độ sâu luồng Côn Đảo

(Vietnamese) Về việc chấm dứt hoạt động phao báo hiệu hàng hải chuyên dùng “A1”, “A2”, “A3” giới hạn vùng nước thi công công trình đường ống thoát nước biển nhà máy Nhiệt điện Vĩnh Tân 4, tỉnh Bình Thuận

Depth in front of An Phu Company’s wharf

Parameters depth of fairway in and out port, turning basin, and waters in front of Xuan Thanh Bagging factory, cement distribution station

Terminate the operation of specialized buoys “SH1”, “SH2”, “SH3” , marking that the construction area and submersion area of ​​the 2022 dredging and maintenance fairway for large-tonnage ships on Hau River 2022